Tietto hits up to 144.34 g/t gold in AG Core infill drilling at Abujar

Highlights:

Tietto adds more shallow high‐grade gold intercepts from infill drilling (25m spacing) at AG Core on

only

the main Abujar Shear at its 3.45Moz Abujar Gold Project; results include:

1.72m @ 61.27 g/t Au from 9m incl. 0.72m @ 144.34 g/t Au (ZDD1192A - Section 25A)

22m @ 1.3 g/t Au from 34m incl. 1m @ 11.15 g/t Au (ZDD1222 - Section 28C)

2m @ 9.2 g/t Au from 33m incl. 1m @ 16.63 g/t Au (ZDD1194 - Section 25A)

Latest results received from AG Core infill drilling (30 DD holes for 3,063m), part of an expanded

use

program targeting delineation of Measured Resources (over 2.9km) expected to be mined during the

first two years of Abujar gold production

Assays pending for infill holes (38 DD holes for 7,095m) drilled at AG Core and AG South

Tietto's six diamond rigs are actively drilling, with more than 100,000m of drilling forecast in CY22

Abujar DFS demonstrated robust financial results and estimated first‐year gold production of

personal

260,000oz and 1.2Moz over the first six years of Abujar's 11‐year mine life for an NPV5% of A$1.3B

(pre‐tax) and A$0.97B (post‐tax) using US$1,700/oz Au and A$/US$=0.741

Updated Abujar LOM production plan on track for delivery early Q3 CY22 Abujar gold plant construction is on target for first gold in Q4 CY22

Construction at Abujar Gold Project is fully funded with no debt.

West African gold explorer and developer Tietto Minerals Limited (ASX: TIE) (Tietto or the Company) is leased to report further shallow high‐grade gold results from infill drilling completed at AG Core, part of

its 3.45Moz Abujar Gold Project in Côte d'Ivoire, West Africa.

ForTietto Managing Director, Dr Caigen Wang, said: "Our infill drilling continues to add more shallow high‐ grade gold intercepts to AG Core. These intercepts provide confirmation of the continuity of these plunging high‐grade shoots from close‐spaced 25m drilling.

"These latest results are from an expanded infill drilling program aiming to grow our Measured Resources over a 2.9km strike between Section Lines 0 to 29 at AG Core and AG South, as we expect to mine these areas during the first two years of Abujar gold production.

  • Refer ASX Announcement dated 5th October 2021
Depth from
9
19
33
29
47
77
32
34
33
66
Hole id
ZDD1192A
ZDD1192A
ZDD1194
ZDD1200
ZDD1207
ZDD1209
ZDD1216
ZDD1222
ZDD1230A
ZDD1230A
Table 1: Significant Intersections from AG Core infill drilling2
Length
1.72
5
2
6
6
20
17
22
1.27
9
Depth to
10.72
24
35
35
53
97
49
56
34.27
75
g/t Au 61.27 3.02 9.20 2.61 2.72 0.87 0.78 1.30 10.97 1.52
includes3
0.72m @ 144.34 g/t Au
1m @ 13.4 g/t Au
1m @ 16.63 g/t Au
5m @ 3.01 g/t Au
5m @ 3.15 g/t Au
7m @ 2.06 g/t Au
6m @ 1.45 g/t Au
1m @ 11.15 g/t Au
1.27m @ 10.97 g/t Au
1m @ 7.00 g/t Au

Tietto Minerals Ltd

Unit 7, 162 Colin Street Perth, WA 6005

Tel: +61 8 9420 8270

Web: www.tietto.com

"Our exploration team is in the process of moving four of our DD rigs to test exploration targets on the main Abujar Shear, which remains still largely untested, and undertake new resource definition drilling.

only"We are fully funded to production at Abujar, which has potential to be one of the largest gold producing mines in Côte d'Ivoire, with an expected production of 260,000 ounces of gold in the first year and 1.2M ounces of gold in the first six years.

"Tietto has an experienced team on board to deliver Abujar on time and on budget. We are on track to deliver another mineral resource update this year. Shareholders can also expect further updates from our aggressive diamond drilling program as we advance our dual strategy of 'Drill and Build' and develop our Abujar Project into West Africa's next gold mine, with first gold by the end of Q4 CY22."

useInfill Drilling - AG Core

Tietto is pleased to report the latest batch of assay results (30 DD holes for 3,063m) from infill diamond drilling at AG Core. Tietto designed this program to convert Indicated Resources at AG Core into Measured Resources in the next MRE update expected later this year. Best intersections received from 1m diamond personaldrill samples are summarised in Table 1. Drill collar details and assay results are in Table 3 and Table 4 respectively. Locations of the reported drill Forcollars and associated assay results are presented in Figure 3. An oblique cross‐section highlighting selected assay results is presented in Figure 4 and an oblique long section presents the results in Figure

5.

Drilling has intersected good widths and grades in assays received to date with these new results, increasing the tally to 81 intervals greater than 50 gold gram metres, including 15 intervals greater than 200 gold gram metres at AG Core (Table 2).

  • 0.4 g/t Au cut off used with max 3m internal dilution and no top cut applied
    3 1.0 g/t Au cut off used with max 3m internal dilution and no top cut applied

Tietto Minerals Ltd Unit 7, 162 Colin Street Perth, WA 6005 Tel: +61 8 9420 8270 Web: www.tietto.com

For personal use only

Table 2: AG Core ‐ significant intersections greater than 50 gold gram metres4

Hole id

From

To

Length

g/t Au

gold gram metres

Section

ZDD895

38

46

8

393.59

3,149

14B

ZDD866

83

93

10

51.75

518

29A

ZDD035

76

83

7

57.79

405

26B

ZDD894

31.6

34

2.4

153.49

368

17A

ZDD084

55

62

7

41.76

292

24B

ZDD685

54

56

2

143.77

288

25A

ZDD687

69

85

16

17.60

282

19C

ZDD095

215

236

21

13.02

273

23B

ZDD043

111

127

16

16.31

261

27C

ZDD1104

84.32

93

8.68

27.61

240

26

ZDD082

83

85

2

113.30

227

26

ZDD696

125

132

7

30.67

215

25A

ZDD028

39

57

18

11.72

211

28B

ZRC171

238

244

6

34.17

205

20

ZDD1113

35

40

5

40.14

201

28

ZDD333

173

194

21

8.73

183

25B

ZDD895

50

62

12

14.61

175

14B

ZDD870

38

43

5

33.86

169

26A

ZDD1152

42

52

10

16.60

166

17

ZDD859

37

47

10

16.53

165

28C

ZDD027

70

88

18

8.37

151

29

ZDD1172

251

263

12

12.39

149

22

ZDD437

203

208

5

28.91

145

19

ZDD899

64

76

12

11.99

144

14C

ZRC172

108

128

20

6.56

131

19B

ZDD445

120

149

29

4.46

129

16B

ZDD665

97

119

22

5.62

124

24A

ZDD180

286

296

10

12.09

121

20B

ZDD058

179

186

7

15.50

109

25

ZDD596

85

88

3

35.65

107

28A

ZDD1192A

9

10.72

1.72

61.27

105

25A

ZDD061

254

255

1

103.90

104

22

ZRC188

70

72

2

51.14

102

20B

ZDD685

61

67

6

17.01

102

25A

ZDD074

174

176

2

50.65

101

22B

ZDD703

187

195

8

12.43

99

23C

ZDD232

370

382

12

7.54

90

24B

ZRC164A

268

286

18

4.90

88

19

ZDD617

66

73

7

12.48

87

25C

ZDD1114

55

70

15

5.79

87

28A

ZDD096

173

178

5

17.27

86

23B

ZDD734

83

90

7

11.87

83

22C

ZDD704

214

232

18

4.36

78

18C

ZDD081

78

94

16

4.75

76

25

ARC17

48

58

10

7.46

75

17B

ZDD703

208

220

12

6.10

73

23C

ZDD730

91

96

5

14.44

72

18C

  • 0.4 g/t Au cut off used with max 3m internal dilution and no top cut applied
10
6
5
1
1
6
6
2
18
8
9
6
2
6
18
2
6
10
4
7
14
8
6
1
2
4
9
2
5.5
2
2
2
5
10
72
72
71
70
70
69
68
67
66
66
63
63
62
59
59
59
58
58
57
57
57
57
56
55
55
55
54
53
53
52
52
51
51
50
218
97
406
178
106
153
106
124
29
267
236
192
68
370
78
76
251
267
540
447
52
128
323
1
254
198
91
2
52
56
120
99
79
250
208
91
401
177
105
147
100
122
11
259
227
186
66
364
60
74
245
257
536
440
38
120
317
0
252
194
82
0
46.5
54
118
97
74
240
23
27C
20B
27C
18C
23B
19B
23B
23A
24B
19A
21C
25
16
21A
24
19
24B
23
24B
27
25A
20B
19C
20B
25
22C
23B
14B
26B
28C
28
14C
16B
7.16
12.07
14.23
70.35
69.76
11.49
11.37
33.53
3.67
8.26
6.97
10.52
31.10
9.91
3.30
29.50
9.60
5.75
14.37
8.16
4.07
7.17
9.35
55.13
27.70
13.63
6.03
26.33
9.66
26.05
26.07
25.58
10.16
5.00
ZRC047A
ZDD029
ZDD212
ZDD043
ZDD1176
ZDD092
ZRC187
ZDD096
ZDD806
ZDD187
ZDD702
ZRC169B
ZRC037
ZDD104
ZDD633
ZRC044
ZRD104
ZDD337A
ZDD511
ZDD235
ZDD1107
ZDD701
ZDD180
ZDD705
ZRC188
ZDD058
ZDD724
ZDD093
ZDD1160
ZDD080
ZDD884
ZDD1113
ZDD770
ZRC174
Length
gold gram metres
To
From
Section
g/t Au
Hole id
Tietto Minerals Ltd Unit 7, 162 Colin Street Perth, WA 6005 Tel: +61 8 9420 8270 Web: www.tietto.com

onlyuse

personalTietto has planned further drilling at AG Core to assess the potential below the planned DFS open pit and test the limits of gold mineralisation, which is still open at depth. For

Tietto Minerals Ltd

Unit 7, 162 Colin Street Perth, WA 6005

Tel: +61 8 9420 8270

Web: www.tietto.com

Next Steps

Tietto completed a A$130 million two‐tranche placement to accelerate development of Abujar, with no onlydebt. The placement allowed the participation of like‐minded investors, keen for the Company to realise

first gold production by Q4 CY22 and produce 260,000oz gold in 2023.

Tietto remains very well positioned to advance its dual strategy of 'Drill and Build' throughout 2022:

  1. Continue to drive rapid resource growth at the 3.45Moz Abujar Gold Project; and
  2. Fast‐track development of Abujar Gold Project to achieve first gold in Q4 CY22.

useTietto continues to deliver project milestones; with Abujar's maiden Measured gold resources of 7.7Mt @ 1.4 g/t Au for 350,000oz reported on 11 April 2022.

Tietto will deliver an update on Abujar's LOM production plan in early Q3 CY22 using the updated Mineral Resource Estimate, increased mill throughput and higher gold prices (spot price is +35% greater than US$1407/oz used in the DFS5 ), targeting a material increase to existing LOM production. Tietto has expanded this to incorporate a scoping study to determine the economic benefits of a heap leach operation at APG running in parallel to the Abujar CIL operation.

Tietto is advancing construction of the processing plant and associated infrastructure, which remains on schedule. Abujar Gold Project is progressing towards first gold pour by the end of Q4 CY22 and is on track to become West Africa's next producing gold mine.

ENDS

This update has been authorised on behalf of Tietto Minerals Limited by:

Dr Caigen Wang

Mark Strizek

Managing Director

Executive Director

Tel: +61 8 9420 8270

Mob: +61 431 084 305

personal

Competent Persons' Statements

The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by Mr Mark Strizek, a Competent Person who is a Member or The Australasian Institute of Mining and Metallurgy. Mr Strizek is a non‐executive director of the Company. Mr Strizek has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaking to qualify as a Competent ForPerson as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Strizek consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears. Additionally, Mr Strizek confirms

that the entity is not aware of any new information or data that materially affects the information contained in the ASX releases referred to in this report.

The information in this presentation that relates to Mineral Resources was prepared by RPM Global and released on the ASX platform on 11 April 2022. The Company confirms that it is not aware of any new information or data that materially affects the Minerals Resources in this publication. The Company confirms that all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed. The Company confirms that the form and context in which the RPM Global's findings are presented have not been materially modified.

The information in this report that relates to Mineral Resources is based on information evaluated by Mr Jeremy Clark who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Clark is an associate of RPM and he consents to the inclusion of the estimates in the report of the Mineral Resource in the form and context in which they appear.

  • ASX 5 October 2021

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Tietto Minerals Ltd. published this content on 20 July 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 20 July 2022 22:33:02 UTC.