WestMountain Index Advisor, Inc. reported that drill operations were completed on September 11, 2012 at the Terra Project in Alaska. The drill program is a continuation of the company's efforts to expand the gold resource at the Terra Project. The 2012 drill program drilled 3,782 feet in four diamond drill holes.

Drilling extended the vein system 200 meters north and one hole was drilled at the Fish vein. The bulk sample gold mill is operational and concentrates were produced during a one week test run. Gustavson & Associates will complete a third party technical report (43-101 compliant) when all assay data is received.

The technical report will include an updated resource from all recent and previous drilling along the 1.2 mile Ben vein gold system. Preliminary assay results from soils and rock chip samples taken this field season from the Camp Creek Midway porphyry target have been received with positive results -- the CCA soil line Camp Creek Midway results a high of 3.19 g/t gold from soil samples collected that averaged 401 ppb Au over 1500 feet of surface exposure. The CCA line was 4,000 feet in length and 39 samples were taken on talus slopes 100 feet apart.

All but four of the samples were gold bearing above detection limits.