Log in
E-mail
Password
Remember
Forgot password ?
Become a member for free
Sign up
Sign up
Settings
Settings
Dynamic quotes 
OFFON

4-Traders Homepage  >  Equities  >  Swiss Exchange  >  Implenia AG    IMPN   CH0023868554

IMPLENIA AG (IMPN)
Mes dernières consult.
Most popular
  Report  
SummaryQuotesChartsNewsAnalysisCalendarCompanyFinancialsConsensusRevisions 
News SummaryMost relevantAll newsofficial PublicationsSector newsTweets
OFFRE ETE Zonebourse : Jusqu'à 6 mois offerts sur tous les portefeuilles

Implenia : A colossus starts moving

share with twitter share with LinkedIn share with facebook
share via e-mail
0
10/06/2017 | 04:01pm CEST

A colossus starts moving - First of two tunnel drilling machines begins work at the Albvorland Tunnel | Ceremony to mark official start of construction

Kirchheim unter Teck, 6 October 2017 - Implenia has been commissioned by Deutsche Bahn to build the Albvorland Tunnel, a key section of the new 60-kilometre-long railway line between Stuttgart and Ulm. Construction work on the tunnel, which will be approximately eight kilometres long, officially began on Friday. The first of the two tunnel drilling machines, known as Wanda, will carve its way through the rocks beneath the Albvorland region between the towns of Kirchheim unter Teck and Wendlingen. The second machine, called Sibylle, will start drilling a little later; work on the two tunnels will progress in parallel.

The ceremony to mark the official start of construction of the Albvorland Tunnel was attended by, among others, Ronald Pofalla, Member of Deutsche Bahn's Management Board responsible for Infrastructure, Guido Wolf, Europe Minister for Baden-Württemberg, Norbert Barthle, Parliamentary State Secretary at the Federal Ministry of Transport, and Anton Affentranger, CEO of Implenia. Tunnel "Godmother" Nicole Hoffmeister-Kraut, Minister of Economic Affairs for Baden-Württemberg, was also there to see work begin on the tunnel that has been named "Nicole" after her.

In addition to the Albvorland Tunnel, Implenia is in charge of building the link to the Stuttgart-Tübingen line, the "Kleine Wendlinger Kurve", and the freight train link, which includes two 170-metre, single-track tunnels at the western portal of the Albvorland Tunnel in Wendlingen.

The two tunnel-boring machines Wanda and Sybille were ceremonially baptised before starting their work (Picture: Jürgen Stresius).

Implenia press contact:

Anna Magdalena Lang

Marketing/Communications Manager

Tel.: +49 152 092 956 98

[email protected]

DB Projekt Stuttgart-Ulm GmbH press contact:

Jan Dambach

Press Officer

Tel.: +49 711 933 19 165

[email protected]


News (PDF)
Image (JPG)



Provider
Channel
Contact
Tensid EQS Ltd., Switzerland
www.tensid.ch


newsbox.ch
www.newsbox.ch


Provider/Channel related enquiries
[email protected]
+41 41 763 00 50

(c) 2017 Tensid EQS Ltd., Switzerland., source Regulatory

share with twitter share with LinkedIn share with facebook
share via e-mail
0
Latest news on IMPLENIA AG
06/21IMPLENIA : wins infrastructure contract in Sweden – Planning and preparati..
PU
06/21Implenia wins infrastructure contract in Sweden
TE
06/21IMPLENIA : wins infrastructure contract in Sweden
AQ
05/31IMPLENIA : is building around 270 homes in the new “Quartier de l’Ét..
PU
05/31Implenia is building around 270 homes in the new “Quartier de l’É..
TE
05/31IMPLENIA : is building around 270 homes in the new “Quartier de l’Ét..
AQ
05/29Implenia celebrates opening of new premises in Crissier
TE
05/29IMPLENIA : celebrates opening of new premises in Crissier
AQ
05/28“SVIZZERA 240 : House Tour” wins Golden Lion at the Venice Architect..
TE
05/28“SVIZZERA 240 : House Tour” wins Golden Lion at the Venice Architect..
AQ
More news
Financials ( CHF)
Sales 2018 4 049 M
EBIT 2018 132 M
Net income 2018 77,6 M
Finance 2018 550 M
Yield 2018 2,95%
P/E ratio 2018 17,98
P/E ratio 2019 13,94
EV / Sales 2018 0,21x
EV / Sales 2019 0,19x
Capitalization 1 408 M
Chart IMPLENIA AG
Duration : Period :
Implenia AG Technical Analysis Chart | IMPN | CH0023868554 | 4-Traders
Technical analysis trends IMPLENIA AG
Short TermMid-TermLong Term
TrendsBearishBullishBullish
Income Statement Evolution
Consensus
Sell
Buy
Mean consensus OUTPERFORM
Number of Analysts 4
Average target price 81,2  CHF
Spread / Average Target 6,4%
EPS Revisions
Managers
NameTitle
Anton Affentranger Chief Executive Officer
Hans-Ulrich Meister Chairman
Beat Fellmann Chief Financial Officer & Head-Corporate Center
Guido Schmidt Chief Information Officer
Chantal Balet Emery Non-Executive Director
Sector and Competitors
1st jan.Capitalization (M$)
IMPLENIA AG12.22%1 424
VINCI-2.27%57 316
CHINA STATE CONSTRUCTION ENGINEERING CORPORATION-9.98%37 462
LARSEN & TOUBRO3.38%26 837
CHINA COMMUNICATIONS CONSTRUCTION CO LTD-8.74%26 588
CHINA RAILWAY GROUP LTD-10.97%24 664