(Alliance News) - Alerion Clean Power Spa announced Wednesday that it has completed construction and started production of two new photovoltaic plants in Romania.

Specifically, construction has been completed and production has started on two new plants, located in the municipality of Peris, each with an installed capacity of about 6 MWp and a total estimated annual output when fully operational of about 19 GWh.

With the start-up of these plants, Alerion's installed capacity in the photovoltaic sector in Romania exceeds 100 MWp.

Alerion Clean Power's stock is down 0.6 percent at EUR17.58 per share.

By Giuseppe Fabio Ciccomascolo, Alliance News senior reporter

Comments and questions to redazione@alliancenews.com

Copyright 2024 Alliance News IS Italian Service Ltd. All rights reserved.