Alt Resources Limited provide the following drilling results from its Mt Ida, Quinns project area, located 90km north-west of Menzies in Western Australia's Northern Goldfields. Alt has completed a 3,726 metre RC drilling program which commenced Friday 21st February 2020 at the Mt Ida and Bottle Creek Gold Project. The Company completed the drilling program in 18 days with Company staff and Challenge Drilling delivering a consistent 207 metres of RC drilling per day. The Company drilled several deposits and prospects during the recently completed RC program including 550 metres of RC at the Belvidere and Boudie prospects at the Quinn's Mining Area, 1702 metres of RC at the Bottle Creek project including the Southwark, Piantos Find, and Single Fin deposits plus an additional 1474 metres of RC drilling having been completed at the Shepherds Bush deposit. Quinn's Mining Area comprises the Boudie Rat and Forrest Belle shallow open pits with additional historical prospects Boudie West, Boudie Beach and Belvidere. Numerous workings exist along the Quinns mineralized trend with recent drilling results indicating the mineralised shears extend south along strike from the Boudie Rat open pit. Limited modern drilling has been conducted at the Quinns project area.