Amerigo Resources Ltd. reported production results of Minera Valle Central for the first quarter ended March 31, 2024. For the quarter, the company Minera Valle Central produced 16.0 million pounds (M lbs) of copper, with 53% of production coming from fresh tailings. MVC?s plant availability was 97.7%.

Molybdenum production was 0.3 M lbs, in line with Amerigo?s annual molybdenum production guidance of 1.2 M lbs.