Antofagasta plc Provides Production Guidance for the Full Year of 2022 and 2023
In 2023 copper production is expected to be between 670,000 and 710,000 tonnes, with completion of the Los Pelambres desalination and concentrator plants, and lower production at Centinela Cathodes.