Auris Minerals Limited announced that Air Core drilling has commenced at the Company's Forrest Copper Project located 130km north of Meekatharra, in the Bryah Basin, Western Australia. A programme of 62 Air Core drill holes
for approximately 5,700m is planned to further evaluate select regional targets comprising: Significant copper/gold drill intercepts within previous Air Core drilling; Chargeability/conductivity targets identified by previously completed IP surveying; and/or Structural targets with similarities to the DeGrussa Copper Deposit. The drill targets are all located outside of the existing Forrest and Wodger resource areas, which have
together produced a total copper resource of 2.4 Mt @ 1.7% Cu for 41,500 t Cu metal. The drill programme is expected to take approximately 2 weeks to complete, with initial assays
expected to be reported in May 2022.