AIEN SEMINAR
Legal and Contractual Aspects of Natural Gas Projects
Chuditch: History of a Timorese Gas Field (in the context of the Maritime Boundary)
Before Sunrise, Jaco Island
Andy Butler
Dili, 19 April 2024
Timor-Leste Offshore: All Stages of the Gas Cycle
▪ | Bayu Undan (Santos): | |
Gas fields, key players and infrastructure | ➢ | Late in field life; undergoing FEED for CCS conversion |
▪ | Greater Sunrise (Woodside): | |
➢ Ongoing negotiations between JV / governments | ||
▪ | Chuditch (Baron/SundaGas): | |
➢ Now Timor-Leste 2nd largest field, appraisal planned | ||
▪ | Exploration: | |
➢ Eni signed PSC for Block P, plan 3D and drilling |
1, 3
24
1 | Approximations based on latest publicly available information | 2 | Estimated remaining | 2 |
3 | Includes gas equivalents of condensate liquids | 4 | Discovery + prospects based on 2D mapping |
Chuditch Area: Earlier Licence History
▪ ZOCA 91-08 - Sagasco / Petroz (1991 - 1997) | |||
Sikatan-1 | ➢ Sikatan-1, 1994, Dry hole | ||
ZOCA 91-08 | ▪ ZOCA 91-09 - Enterprise (1991 - 2001) | ||
Sagasco | ➢ Farm-in 1996, Shell (operator) and Mitsubishi | ||
ZOCA | ➢ Chuditch-1, 1998, Gas Discovery | ||
(1989 - 2002) | Chuditch-1 | ▪ | ZOCA 91-14 - Enterprise / Nippon (1991 - 1997) |
ZOCA 91-09 | ➢ Nabarlek-1, 1994, Dry hole | ||
➢ Wallaroo-1, 1996, Dry hole | |||
Enterprise (then Shell) | |||
Wallaroo-1 | Australia | ||
Nabarlek-1 | |||
ZOCA 91-14 | |||
Enterprise | |||
3 |
Chuditch Area: Earlier Licence History
▪ ZOCA 91-08 - Sagasco / Petroz (1991 - 1997) | |||||
Sikatan-1 | ➢ Sikatan-1, 1994, Dry hole | ||||
▪ ZOCA 91-09 - Enterprise (1991 - 2001) | |||||
➢ Farm-in 1996, Shell (operator) and Mitsubishi | |||||
JPDA | ➢ Chuditch-1, 1998, Gas Discovery | ||||
(2002 - 2019) | JPDA 06-101(A) | Chuditch-1 | ▪ | ZOCA 91-14 - Enterprise / Nippon (1991 - 1997) | |
➢ Nabarlek-1, 1994, Dry hole | |||||
Minza Oil & Gas | |||||
➢ Wallaroo-1, 1996, Dry hole | |||||
▪ JPDA 06-101(A) - Minza Oil & Gas (2006 - 2013) | |||||
➢ 3D seismic acquired 2012 | |||||
Wallaroo-1 | Australia | ➢ | No wells drilled | ||
Nabarlek-1 | ➢ Exited in 2013 | ||||
4 |
Chuditch Area: Earlier Licence History
▪ ZOCA 91-08 - Sagasco / Petroz (1991 - 1997) | ||||
Sikatan-1 | ➢ Sikatan-1, 1994, Dry hole | |||
TL-SO-19-16 PSC | ▪ ZOCA 91-09 - Enterprise (1991 - 2001) | |||
SundaGas | ➢ Farm-in 1996, Shell (operator) and Mitsubishi | |||
Timor-Leste | ➢ Chuditch-1, 1998, Gas Discovery | |||
(2019 onwards) | Chuditch-1 | ▪ | ZOCA 91-14 - Enterprise / Nippon (1991 - 1997) | |
➢ Nabarlek-1, 1994, Dry hole | ||||
➢ Wallaroo-1, 1996, Dry hole | ||||
▪ JPDA 06-101(A) - Minza Oil & Gas (2006 - 2013) | ||||
➢ 3D seismic acquired 2012 | ||||
Wallaroo-1 | Australia | ➢ | No wells drilled | |
Nabarlek-1 | ➢ Exited in 2013 | |||
▪ JPDA 06-101(A) - SundaGas (2019 onwards) | ||||
5 |
History of SundaGas and Chuditch to date
Maritime Boundaries agreement period | Covid-19 pandemic | |||||||||||||
UNCLOS | Conciliation | Agreement | Treaty | Treaty | No trips possible | |||||||||
ratification | to Timor-Leste | |||||||||||||
compulsory | Begins | reached | signed | |||||||||||
conciliation | ||||||||||||||
requested | ||||||||||||||
Covid-19 cases | ||||||||||||||
2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | |||||||
Today
2024
SundaGas | JPDA PSC | 1st Timor-Leste | 2nd TL PSC | Chuditch | Commence 3D | Dili | Complete CPR | Drilling | Site | Drill |
activities | application | PSC application, | application | PSC award | seismic work | office | 3D repro | Mgr hired | Survey | Chuditch-2 |
company registered | ||||||||||
Other Timor-Leste | 2 | nd Licence Round | Carnarvon | 2nd Licence Round | 2nd Licence Round |
offshore activities | Launch | drilling | Awards | Offshore PSC signed | |
(Eni) | |||||
6
Chuditch PSC: What has been achieved?
Chuditch Field
- Estimated resources of c.700 Bcf
Dec 2017
Today
Discovered Resources
➢ Chuditch: | Pmean = 1,165 Bcf |
Prospective Resources | |
➢ Chuditch NE: | Pmean = 863 Bcf |
➢ Chuditch SW: | Pmean = 855 Bcf |
➢ Quokka: | Pmean = 410 Bcf |
Maritime boundaries prior to 2019
7
Chuditch-2 Appraisal Well: Plan and Status
▪ Plan to drill in Q4 2024
▪ Appraisal 5.1 km from discovery, in 68m water
▪ 149m gas column predicted (vs 30m at Chuditch-1)▪ Simple vertical well, including DST
▪ Drill team assembled; well planning progressing ▪ Site survey completed
All depths are metres below mean sea level | 8 |
Chuditch NE Prospect 'captured' through Maritime Boundary change
Chuditch NE: |
"the best undrilled |
prospect in Timor-Leste"* |
Chuditch |
Field |
* Andy Butler, April 2024 | 9 |
Example Chuditch Field Development Concept
Chuditch Engineering
Concept (illustrative)
Chuditch
NE
Chuditch
Chuditch SW
Principal
LNG flows
in Asia
Pacific
Domestic & relatively minor LNG flows not shown | 10 |