Blue Energy Limited provided update on Sapphire Pilot Testing as follows: As announced 5 September 2023, the Sapphire Pilot situated in ATP 814, was shut in to conduct a pressure build up test, which is aimed at establishing well flow capacity, permeability and skin effects. Whilst preparing to restart production testing operations at Sapphire an oil cooling motor was observed to be over heating with automatic shutdown sensors tripping the surface Hydraulic Pump Unit. This curtailed the pumping on the Sapphire 6V well.