Bondada Engineering Limited has received blanket work orders from M/s. Bharti Airtel Limited, the important terms and conditions of which are mentioned as: Significant terms and conditions of order(s): Supply of 6 Mtr Height GI pole Wt 60kg (Hot Dipped Galvanised) without Base and supply of 6 Mtr Height GI pole Wt 66kg (Hot Dipped Galvanised) without Base, 42,500 qty amounting to INR 275,825,000/- (including GST) to Haryana. Size of the order(s)/contract(s): INR 275,825,000/- (Including GST).
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
1,866 INR | +5.00% | +8.14% | +369.60% |
May. 08 | Bondada Engineering Bags INR14 Million Order from Bharti Airtel | MT |
May. 01 | Bondada Engineering Limited Reports Earnings Results for the Full Year Ended March 31, 2024 | CI |
1st Jan change | Capi. | |
---|---|---|
+369.60% | 460M | |
+1.93% | 71.31B | |
+21.87% | 38.86B | |
+14.76% | 31.94B | |
+10.78% | 27.7B | |
+19.01% | 21.72B | |
+17.14% | 19.92B | |
+35.34% | 18.01B | |
+73.41% | 17.56B | |
+15.90% | 15.63B |
- Stock Market
- Equities
- 543971 Stock
- News Bondada Engineering Limited
- Bondada Engineering Limited Receives Blanket Work Orders from M/S. Bharti Airtel Limited