LarrainVial Andean E- Conference
March, 2022
Colombia | Panama | Costa Rica | Honduras
Celsia at a glance
22 hydro
1.250 MWGen.
T&D
6 solar
78 MW
1 wind
50 MW
3 thermalTotal RAB
Consolidated
356 MW
$3,63 Bill.
$0,6 Bill. Caoba
Distribution networks
43.415 kmTransmission networks
274 km
2 district cooling systems in operation
Conventional energy + Beyond-the-metter portfolio
57 back-up facilities operating
4353 Projects - Energy efficiency solutions
~200 USD mill.
Hydro
Grid / Distribution
Distributed solar
Guajira wind projects
Thermal backup
1.290 MW | 3,6 USD bill. RAB
78,1 MW
1,4 USD bill.
~180 USD mill.1
*Receivables with Celsia Colombia, Prime (Termoflores) and C2Energía + Fiduciary assets BLM + Risks management assets
480 MW
CapEx
2021 COP$1,6 Bill.
Growth platforms +$936.000 mill.
Tesorito, C2 Energía (SFV), Caoba
Expansion +$411.000 mill.
Redes, Generación, otros
Continuity +$269.000 mill.
Investments Bill. COP
CapexM&A
2016
2017
2018
2019
2020
2021 YTD
CapEx
2022E COP$4 Bill.
COP 800.000 mill. - Celsia
COP 3.2 Bill. - Platforms
Growth platforms
Largescalesolar (C2), Transmission(Caoba), Thermalbackup(Tesorito).
Expansion
Grid(Tolima/Valle), Generation, Distributedsolar, other.
Continuity
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Celsia SA ESP published this content on 29 March 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 30 March 2022 21:11:22 UTC.