Cordoba Minerals Corp. announced that Cordoba has completed a Feasibility Study ("Feasibility Study") prepared in accordance with the National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") for the Company's Alacran Project ("Alacran or Project"). The 2023 Feasibility Study Provides Further Confidence on the Capability of the Alacran Project.

The results from the 2023 In-Fill Drilling Campaign ("in-fill drilling") reinforces the consistency between the 2023 Feasibility Study and 2022 Pre-Feasibility Study mineral resource block models by intersecting grades broadly consistent with those previously predicted. Jaime Aroca, Chief Geologist, with Anibal Quintero, a member of the drilling team to inspect the core barrel and monitor the quality of the core samples at the Alacran Project. Symbolic intercepts from the in-fill drilling campaign include: ACD195 at 71.11 metres ("m") from 48.89 m to 120 m with 0.98% Cu, 0.34 g/t Au and 6.16 g/t Ag, or 1.15% Cu equivalent1 ("CuEq").

As a result, the Feasibility Study envisages a dual processing plant design for the Project.