Cougar Metals NL provided further drilling results from the Toamasina Saprolitic Graphite Project, Madagascar. Cougar is earning a 50% interest in the Project by completing a PEA to NI 43-101 standards utilising a minimum of 3000m of drilling and 1000m of trenching. The latest drill results comprise of a further sixteen holes (16) holes and one trench from the Main Zone and complement the results from the initial results of 3 holes released to the ASX on 27 July. VHT0025: 11.50m @ 7.23% Cg, from surface; VHT0016: 12.00m @ 4.14% Cg from 8.50m and 4.50m @ 5.20% Cg, from 25.00m; VHT0019: 19.50m @ 6.12% Cg, from 10.00m - Incl. 4.50m @ 10.59% Cg, from 19.00m. Section 2 Exploration Results: Drill hole information was 41 holes for 1,2320m of air core have been completed to date, holes are spaced on a planned 80m x 80m grid pattern and drilled vertically, drill hole collar file is planned for inclusion with the first batch of assay results.