Cyprium Mining Corporation announced increased production plans following the successful start of operations at the company's 100 ton per day flotation plant located in Aldama, Mexico in May. In May the company announced the start of the toll milling operations at the Aldama plant and the signing of two mill feed supply agreements. Following the conclusive test runs of both the stockpiles from the historic Potosi Silver mine and the mineralized material from a mine in Moctezuma, Sonora, the company decided to ramp up production from the May and June level of 1,000 tons per month to 2,000 tons per month in July.

To that end, the company secured a minimum of 6,000 additional tons of the Potosi stockpiles and 2,000 tons of the mill feed from Moctezuma.