Eland Oil & Gas PLC announced the initial results of its testing of the Ubima-1 after a dual completion was installed on the E1000/E2000 and F7000 reservoirs. Further to the RNS of September 18, 2018, in which the Company announced that the F7000 reservoir was tested at flow rates of up to 2,500 barrels of oil per day (bopd) on a 24/60 choke, testing of the E1000/E2000 reservoirs, produced by the Ubima-1 well, has continued. The E1000/E2000 reservoirs flowed at 900 to 1,000 barrels of oil per day (bopd) on a 28/64 choke with a flowing tubing head pressure (FTHP) of 22 bar (315 psi). Due to storage limitations, the well test was suspended prior to acquiring representative fluid samples.