EnBW Impact Report 2023 | ||||||
Green senior bond October 2018 (XS1901055472) | ||||||
Project category | Investments attributable to the bond (€m, per category)1 | Generation capacity attributable to the bond in MW1 | Generated electricity attributable to the bond (MWh) in 20231 | CO2 avoidance factor in gCO2eq/kWh2 | Emissions avoided attributable to the bond (tCO2eq)1 | Number of charges in 2023 |
Total Wind Offshore Germany | 222.8 | 66.5 | 201,586 | 771 | 155,423 | |
Total Wind Onshore Germany | 245.3 | 141.0 | 365,598 | 758 | 277,123 | |
Total Solar (PV) Germany | 20.2 | 27.8 | 26,199 | 690 | 18,077 | |
Expansion of charging infrastructure Germany (89 locations) | 8.1 | 679,315 | ||||
Total | 496.4 | 235.4 | 593,382 | 450,623 | 679,315 | |
Green subordinated bonds August 2019 (XS2035564975 & XS2035564629) | ||||||
Project category | Investments attributable to the bonds (€m, per category)1 | Generation capacity attributable to the bonds in MW1 | Generated electricity attributable to the bond (MWh) in 20231 | CO2 avoidance factor in gCO2eq/kWh2 | Emissions avoided attributable to the bond (tCO2eq)1 | |
Total Wind Offshore Germany | 839.7 | 250.1 | 757,569 | 771 | 584,086 | |
Total Wind Onshore Germany | 75.1 | 44.5 | 99,859 | 758 | 75,693 | |
Total Wind Onshore Sweden | 63.2 | 107.5 | 236,740 | - | - | |
Total Solar (PV) Germany | 18.5 | 34.7 | 31,828 | 690 | 21,961 | |
Total | 996.5 | 436.9 | 1,125,996 | 681,740 | ||
Green subordinated bond June 2020 (XS2196328608) | ||||||
Project category | Investments attributable to the bond (€m, per category)1 | Generation capacity attributable to the bond in MW1 | Generated electricity attributable to the bond (MWh) in 20231 | CO2 avoidance factor in gCO2eq/kWh2 | Emissions avoided attributable to the bond (tCO2eq)1 | |
Total Wind Onshore France | 494.8 | 621.9 | 745,307 | 82 | 61,115 | |
Total Solar (PV) France | 119.5 | 146,826 | 45 | 6,607 | ||
Total | 494.8 | 741.4 | 892,132 | 67,722 | ||
Green subordinated bond August 2021 (XS2381272207) | ||||||
Project category | Investments attributable to the bond (€m, per category)1 | Generation capacity attributable to the bond in MW1 | Generated electricity attributable to the bond (MWh) in 20231 | CO2 avoidance factor in gCO2eq/kWh2 | Emissions avoided attributable to the bond (tCO2eq)1 | Number of charges in 2023 |
Total Wind Offshore UK | 269.8 | 508.8 | 0 | |||
Total Wind Onshore Germany | 77.7 | 63.4 | 124,248 | 758 | 94,180 | |
Total Wind Onshore Sweden | 16.6 | 12.6 | 30,330 | - | - | |
Total Solar (PV) Germany | 121.6 | 237.1 | 193,848 | 690 | 133,755 | |
Expansion of charging infrastructure Germany (225 locations) | 12.5 | 698,123 | ||||
Total | 498.3 | 821.9 | 348,426 | 227,935 | 698,123 | |
Green senior bond November 2022 (XS2558395351) | ||||||
Project category | Investments attributable to the bond (€m, per category)1 | Generation capacity attributable to the bond in MW1 | Generated electricity attributable to the bond (MWh) in 20231 | CO2 avoidance factor in gCO2eq/kWh2 | Emissions avoided attributable to the bond (tCO2eq)1 | Number of charges in 2023 |
Total Wind Offshore UK | 151.1 | 1,154.7 | 0 | |||
Total Wind Onshore Germany | 282.6 | 191.3 | 127,418 | 758 | 96,583 | |
Total Solar (PV) Germany | 28.6 | 42.7 | 17,092 | 690 | 11,793 | |
Expansion of charging infrastructure Germany (221 locations) | 34.8 | 1,175,215 | ||||
Total | 497.1 | 1,388.7 | 144,509 | 108,376 | 1,175,215 | |
Green senior bond November 2022 (XS2558395278) | ||||||
Project category | Investments attributable to the bond (€m)1 | Number of projects or investment measures attributable to the bond | Connected renewables generation capacity connected to the distribution grid in MW (%-change vs. previous year)1 | Electricity fed into the distribution grid from renewable energies in TWh (%-change vs. previous year)1 | ||
Electricity distribution grids Germany | 498.8 | 6,391 | 6.347,95 (+10%) | 10,16 (+15,7%) | ||
Green senior bond November 2023 (XS2722717472) | ||||||
Project category | Investments attributable to the bond (€m, per category)1 | Generation capacity attributable to the bond in MW1 | Generated electricity attributable to the bond (MWh) in 20231 | CO2 avoidance factor in gCO2eq/kWh2 | Emissions avoided attributable to the bond (tCO2eq)1 | Number of charges in 2023 |
Total Wind Offshore UK | 221.6 | 816.6 | 0 | |||
Total Wind Offshore Germany | 114.9 | 162.6 | 11,404 | 771 | 8,792 | |
Total Solar (PV) Germany | 178.2 | 254.4 | 30,710 | 690 | 21,190 | |
Total Solar (PV) France | 34.0 | 38.3 | 45,761 | 45 | 2,059 | |
Expansion of charging infrastructure Germany (210 locations) | 98.6 | 993,160 | ||||
Total | 647.2 | 1,271.9 | 87,875 | 32,042 | 993,160 | |
Green senior bond November 2023 (XS2722717555) | ||||||
Project category | Investments attributable to the bond (€m)1 | Number of projects or investment measures attributable to the bond | Connected renewables generation capacity connected to the distribution grid in MW (%-change vs. previous year)1 | Electricity fed into the distribution grid from renewable energies in TWh (%-change vs. previous year)1 | ||
Electricity distribution grids Germany | 836.0 | 6,391 | 6.347,95 (+10%) | 10,16 (+15,7%) | ||
Not allocated | 9.3 | |||||
Total | 845.3 | |||||
Footnotes | ||||||
1 Rounded figures | ||||||
2 Source: Germany: Federal Environmental Agency publication "Climate Change 49/2023 - Emissionsbilanz erneuerbarer Energieträger, Bestimmung der vermiedenen Emissionen im Jahr 2022", as of December 2023; France: Own calculation Source: "RTE - 2022 Electricity Review"; UK: Avoided emissions assume that green electricity generated from offshore wind replaces an equal quantity of electricity generation from fossil fuels; Source: "Britain's Electricity Explained: 2023 Review" as of 9 January 2024 | ||||||
3 Avoided emissions not calculated. In Sweden, the energy generated from renewables and low-CO2 generation (nuclear energy) is at over 90%. It is assumed that additional renewables do not contribute to additional CO2 avoidance.; Source: International Energy Agency - Energy Policies of IEA countries - Sweden 2019 Review | ||||||
4 Allocated share of generation capacity for information. Value is not representative as the project is still in the design phase. | ||||||
5 Proceeds not yet allocated will be used according to the EnBW Green Financing Framework. EnBW is holding these in any form of cash, bank deposit or other form of available current financial assets. They will be allocated to eligible projects wihtin 2 years from issuance date. |
3
3
4
4
4
5
EnBW Allocation Report 2023 | |||||
Green senior bond October 2018 (XS1901055472) | |||||
Project category | New build project (not in operation at the time of first allocation) | Project name | Investments attributable to the bonds (€m, per category)1 | Installed capacity in MW1 | Generation capacity attributable to the bond in MW1 |
WIND OFFSHORE Germany | x | Hohe See | 521.9 | 56.2 | |
x | Albatros | 117.6 | 10.3 | ||
Total Wind Offshore | 222.8 | 639.5 | 66.5 | ||
WIND ONSHORE Germany | Fuerth | 16.5 | 16.1 | ||
Freckenfeld | 19.8 | 9.8 | |||
Langenburg | 33.5 | 33.4 | |||
Winterbach | 9.9 | 4.8 | |||
Aalen-Waldhausen | 16.5 | 9.7 | |||
Buchholz III | 13.2 | 6.6 | |||
Dünsbach | 9.9 | 5.0 | |||
Bühlertann | 13.2 | 6.6 | |||
Dienstweiler | 4.8 | 2.4 | |||
Homburg | 9.6 | 9.6 | |||
x | Wiemerstedt I & II | 11.4 | - 0 | ||
x | Ruppertshofen III | 4.2 | 2.5 | ||
Boxberg-Angeltürn | 12.0 | 9.2 | |||
Boxberg-Bobstadt | 12.0 | 9.2 | |||
Harthäuser Wald (Extension) | 12.0 | 10.3 | |||
Königheim | 6.0 | 5.9 | |||
Total Wind Onshore | 245.3 | 204.5 | 141.0 | ||
SOLAR (PV) Germany | x | Braunsbach-Zottish. | 0.8 | 0.2 | |
x | Ingoldingen | 4.4 | 2.4 | ||
x | Riedlingen-Zwiefaltendorf | 5.2 | 2.2 | ||
Berghülen | 2.7 | 1.4 | |||
Eggesin | 10.0 | 5.0 | |||
Tuningen | 4.5 | 2.1 | |||
x | Löffingen | 2.7 | 1.4 | ||
x | Müssentin | 9.3 | 4.7 | ||
x | Torgau | 4.9 | 2.5 | ||
Welgesheim | 3.2 | 1.6 | |||
Mühlhausen-Ehingen | 8.9 | 4.5 | |||
Total Solar (PV) | 20.2 | 56.4 | 27.8 | ||
Expansion of charging infrastructure Germany | 2018: 89 locations | 8.1 | |||
Total | 496.4 | 900.3 | 235.4 | ||
Green subordinated bonds August 2019 (XS2035564975 & XS2035564629) | |||||
Project category | New build project (not in operation at the time of first allocation) | Project name | Investments attributable to the bonds (€m, per category)1 | Installed capacity in MW1 | Generation capacity attributable to the bonds in MW1 |
WIND OFFSHORE Germany | x | Hohe See | 521.9 | 201.5 | |
x | Albatros | 117.6 | 48.6 | ||
Summe Wind Offshore | 839.7 | 639.5 | 250.1 | ||
WIND ONSHORE Germany | Hasel | 9.9 | 4.9 | ||
Brettenfeld | 6.6 | 3.2 | |||
Burgholz | 9.9 | 5.0 | |||
Rosenberg Süd | 6.6 | 3.2 | |||
Nonnweiler | 4.8 | 2.4 | |||
Rot am See II | 3.3 | 3.3 | |||
x | Prötzel I | 9.0 | 4.5 | ||
Rot am See I | 9.9 | 9.7 | |||
Webenheim | 6.2 | 3.1 | |||
x | Tantow | 10.8 | 1.1 | ||
x | Hardheim-Höpfingen | 17.0 | 4.1 | ||
WIND ONSHORE Sweden | Röbergsfjället Vind | 16.0 | 16.0 | ||
Bliekevare Vind | 32.0 | 32.0 | |||
Säliträdberget Vind | 16.0 | 16.0 | |||
Hedbodberget Vind | 12.0 | 12.0 | |||
Granberg Vind | 10.0 | 10.0 | |||
Brahehus Vind | 11.5 | 11.5 | |||
Gnosjö Energi / Kulltorp | 10.0 | 10.0 | |||
Total Wind Onshore | 138.3 | 201.5 | 152.0 | ||
SOLAR (PV) Germany | x | Inzigkofen | 7.5 | 2.9 | |
x | Leibertingen II | 5.0 | 1.9 | ||
x | Lindendorf | 6.9 | 3.4 | ||
Sophienhof I | 8.6 | 4.3 | |||
x | Alttrebbin | 151.0 | 22.2 | ||
Total Solar (PV) | 18.5 | 178.9 | 34.7 | ||
Total | 996.5 | 1,019.9 | 436.9 | ||
Green subordinated bond June 2020 (XS2196328608) | |||||
Project category | Project name | Investments attributable to the bond (€m, per category)1 | Installed capacity in MW1 | Generation capacity attributable to the bond in MW1 | |
Wind Onshore France | Refinancing of the acquisition of Groupe Valeco in 2019 | 494.8 | 806.3 | 621.9 | |
Solar (PV) France | 130.2 | 119.5 | |||
Total | 494.8 | 936.5 | 741.4 | ||
Green subordinated bond August 2021 (XS2381272207) | |||||
Project category | New build project (not in operation at the time of first allocation) | Project Name | Investments attributable to the bond (€m, per category)1 | Installed capacity in MW1 | Generation capacity attributable to the bond in MW1 |
WIND OFFSHORE UK | x | Morgan + Mona | 3,000.0 | 508.8 | |
Total Wind Offshore | 269.8 | 3,000.0 | 508.8 | ||
WIND ONSHORE Germany | Oberramstadt | 8.4 | 3.4 | ||
Königsbronn | 3.5 | 3.5 | |||
x | Hüttersdorf | 6.6 | 3.1 | ||
x | Tantow | 10.8 | 9.7 | ||
Prötzel V | 18.0 | 18.0 | |||
Obhausen | 36.0 | 13.4 | |||
x | Krautheim | 12.6 | 12.4 | ||
WIND ONSHORE Sweden | Rammarehemmet | 12.6 | 12.6 | ||
Total Wind Onshore | 94.3 | 108.5 | 76.0 | ||
SOLAR (PV) Germany | x | Weesow-Willmersdorf | 187.0 | 93.7 | |
x | Maßbach | 28.0 | 13.2 | ||
x | Alttrebbin | 151.0 | 53.5 | ||
x | Gottesgabe | 153.1 | 76.7 | ||
Total Solar (PV) | 121.6 | 519.1 | 237.1 | ||
Expansion of charging infrastructure Germany | 2021: 225 locations | 12.5 | |||
Total | 498.3 | 3,627.6 | 821.9 | ||
Green senior bond November 2022 (XS2558395351) | |||||
Project category | New build project (not in operation at the time of first allocation) | Project Name | Investments attributable to the bond (€m, per category)1 | Installed capacity in MW1 | Generation capacity attributable to the bond in MW1 |
WIND OFFSHORE UK | x | Morgan + Mona | 3,000.0 | 160.5 | |
x | Morven | 2,900.0 | 994.2 | ||
Total Wind Offshore | 151.1 | 5,900.0 | 1,154.7 | ||
WIND ONSHORE Germany | x | Grömbach | 7.2 | 7.2 | |
x | Wiemerstedt I & II | 11.4 | 0.1 | ||
Oberramstadt | 8.4 | 4.6 | |||
x | Hüttersdorf | 6.6 | 3.4 | ||
Hemme | - 0 | - 0 | |||
Obhausen | 36.0 | 22.6 | |||
x | Steinheim | 21.0 | 21.0 | ||
x | Wulkow-Trebnitz | 21.0 | 21.0 | ||
x | Düsedau II | 22.4 | 22.4 | ||
x | Häusern | 6.9 | 6.5 | ||
x | Hohenstadt | 12.6 | 12.6 | ||
x | Lentföhrden | 24.0 | 24.0 | ||
x | Veringenstadt B | 4.0 | 3.8 | ||
x | Prötzel II | 37.8 | 37.8 | ||
x | Hardheim-Höpfingen | 17.0 | 0.1 | ||
x | Sulzbach-Laufen | 22.2 | 4.2 | ||
Total Wind Onshore | 282.6 | 258.5 | 191.3 | ||
SOLAR (PV) Germany | x | Braunsbach-Zottish. | 0.8 | 0.5 | |
Widdern | 9.0 | 8.4 | |||
Roigheim | 8.6 | 8.5 | |||
Tauberb. Fichtengrund | 2.4 | 2.3 | |||
x | Braunsbach-Tierberg | 5.2 | 5.1 | ||
x | Billigheim-Waldmühlbach | 12.3 | 11.8 | ||
x | Birkenfeld | 5.8 | 2.8 | ||
Ulrichshof | 6.5 | 3.3 | |||
Total Solar (PV) | 28.6 | 50.5 | 42.7 | ||
Expansion of charging infrastructure Germany | 2022: 221 locations | 34.8 | |||
Total | 497.1 | 6,209.0 | 1,388.7 | ||
Green senior bond November 2022 (XS2558395278) | |||||
Project category | Investments attributable to the bond (€m)1 | Number of projects or investment measures attributable to the bond | |||
Electricity distribution grids Germany | 498.8 | 6,391 | |||
Green senior bond November 2023 (XS2722717472) | |||||
Project category | New build project (not in operation at the time of first allocation) | Project Name | Investments attributable to the bond (€m, per category)1 | Installed capacity in MW1 | Generation capacity attributable to the bond in MW1 |
WIND OFFSHORE Germany | x | Hohe See | 521.9 | 3.8 | |
x | He Dreiht | 900.0 | 158.8 | ||
WIND OFFSHORE UK | x | Morgan + Mona | 3,000.0 | 360.8 | |
x | Morven | 2,900.0 | 455.8 | ||
Total Wind Offshore | 336.4 | 7,321.9 | 979.2 | ||
SOLAR (PV) Germany | Rosenberg | 10.2 | 9.3 | ||
x | Billigheim-Waldmühlbach | 12.3 | 0.2 | ||
x | Birkenfeld | 5.8 | 0.1 | ||
x | Külsheim-Gickelfeld | 29.6 | 29.6 | ||
Brandscheid | 7.6 | 7.6 | |||
Bad Camberg | 4.1 | 4.1 | |||
Allmendingen | 12.9 | 12.4 | |||
Emmingen-Liptingen | 17.3 | 17.3 | |||
x | Sophienhof 2 | 6.2 | 6.2 | ||
x | Bruchsal-Untergrombach | 4.0 | 4.0 | ||
x | Haiterbach_Blätchenschneider | 8.6 | 8.6 | ||
x | Haiterbach_Unterschwandorf | 10.6 | 10.6 | ||
x | Bingen | 3.0 | 2.3 | ||
x | Langenenslingen | 79.9 | 79.9 | ||
x | Gundelsheim | 62.2 | 62.2 | ||
SOLAR (PV) France | Marseillan | 0.3 | 0.3 | ||
Transport Rosson | 2.2 | 2.2 | |||
Aguessac | 5.0 | 5.0 | |||
Megasol 2 | 2.2 | 1.4 | |||
Les Calottes | 4.3 | 4.3 | |||
Argent sur salde | 20.1 | 20.1 | |||
Gignac | 5.0 | 5.0 | |||
Total Solar (PV) | 212.2 | 313.3 | 292.7 | ||
Expansion of charging infrastructure Germany | 2022: 221 locations | 34.7 | |||
Expansion of charging infrastructure Germany | 2023: 210 locations | 63.9 | |||
Total Charging infrastructure | 98.6 | ||||
Total | 647.2 | 7,635.2 | 1,271.9 | ||
Green senior bond November 2023 (XS2722717555) | |||||
Project category | Investments attributable to the bond (€m)1 | Number of projects or investment measures attributable to the bond | |||
Electricity distribution grids Germany | 836.0 | 6,391 | |||
Not allocated | 9.3 | ||||
Total | 845.3 | ||||
Footnotes | |||||
1 Figures rounded | |||||
2 Allocated share of generation capacity for information. Value is not representative as the project is still in the design phase. | |||||
3 Proceeds not yet allocated will be used according to the EnBW Green Financing Framework. EnBW is holding unallocated proceeds in any form of cash, bank deposit or other form of available current financial assets. They will be allocated to eligible projects within 2 years from issuance date. |
2
2
2
2
2
3