Endeavour Silver Corp. provided consolidated production guidance for the year 2022. in 2022, silver production is expected to range from 4.2 to 4.8 million ounces (oz) and gold production is anticipated to be between 31,000 oz and 35,000 oz.

Silver equivalent production is forecasted to total between 6.7 million and 7.6 million oz at an 80:1 silver: gold ratio. Tonnes per day is expected to be in the range of 2,100 TPD to 2,400 TPD.