Fresnillo Plc provided production guidance for the year 2020. Despite the uncertainty, 2020 silver production guidance remains in the range of 51 to 56 moz (including Silverstream) while gold production is now expected to be in a range of 785 to 815 koz (previously 815 to 900 koz) as a result of COVID-19 related disruption.