Frontera Resources Corporation announced the mobilisation of a workover rig to the Dino-2 well site, situated inside the 800 square km Taribani Complex area located in onshore Block 12, Georgia. The workover rig will execute operations including the removal of the production tubing, downhole pump and packer, cleaning the well and preparing it for the sidetracking/drilling operations which is scheduled to commence in January 2018. Once operations are completed at Dino-2 well, it is intended that the workover rig will move to T-45 well site in Taribani Complex area in order to remove production tubing, downhole pump and packer and clean and prepare the well for deepening/drilling operations which is scheduled to commence in March 2018. Dino-2 well will be drilled to a target depth of 2,700m and, as previously announced on 10 October 2017, Zones 9, 14 and 15 of the Eldari reservoir will be stimulated and produced together. T-45 well will be extended to a target depth of 2,700m and Zones 9, 14 and 15 of the Eldari reservoir will be stimulated and produced together, in a similar manner as Dino-2 well.