NEW DIRECTION

QUEENSLAND GAS PRODUCTION

February, 2022

COMPANY STRATEGY

GAS IN EASTERN AUSTRALIA

only

Gas price currently about A$9/Gj at Wallumbilla Hub in eastern Queensland

Gas shortage for east coast domestic and export LNG markets - gas sale opportunities good

Excellent opportunities for new gas discoveries in Surat Basin where exploration has been

largely dormant since the 1990s

use

Apply recently developed 3D seismic acquisition and processing technology to increase

chances of success - similar approach to that applied so successfully on the western flank of

the Cooper Basin with proven Permian, Triassic and Jurassic age reservoir targets

GGX technical executives were involved in many of the gas and oil discoveries made in this

area of the Surat Basin during the 1980s and will now be leveraging off that original success

STRATEGY

personalr

Target gas sales by the end of 2022 from the undeveloped Riverside Gas Field (2 wells)

Production wells may require fracture stimulation

Target gas reserve and sale increase through exploration - significant gas resource upside

Inversion processing of existing 3D seismic data set incorporating known gas accumulations

from historic production wells target both structural and stratigraphic accumulations

Drill one new exploration well to test for gas target as delineated by inversion processing

Acquire 300 sq/kms new 3D seismic data over area attractive for new gas discoveries

Drill one new well based on 3D seismic data to test for gas

Targets and Strategy

2

NEW VENTURE SUMMARY

onlySURAT BASIN, QUEENSLAND

Farmin 50% ‐ Armour Energy (ASX: AJQ)

Riverside Gas Field (part of PR 511)

Riverside Gas Field Development

use

Riverside North‐1 to be drilled by June, 2022

In addition, frac either Riverside‐1 or Riverside North‐1

Target two Riverside Field gas wells online for gas sale by year end 2022

personalr

Myall‐Bainbilla Area

Encompasses 5 existing licences adjacent to PR 511 (Riverside Gas Field)

and the large Churchie‐Myall Creek Gas Fields

Existing 3D seismic data being processed using seismic inversion

technology in order locate areas with gas charged high quality reservoirs

One well to be drilled in 2023 to target more gas

New 248 sq km 3D seismic survey to evaluate large area between the Churchie‐Myall Creek Gas Field and the Kincora Gas Field

Drill one new well in 2023 within the 3D seismic survey to target gas

2022 end by Production in Wells Gas New 2

3

NEW SURAT BASIN ASSET FARMIN

r personal use only

Assets Basin Surat

4

Riverside Gas Field

only

Riverside Gas Field

Drilled in 1997

Gas kick from Tinowon Formation required well

control, over‐pressured gas

Well killed with heavy mud - formation damaged

use

Open hole DST of top section flowed 836 mcfd

Cased and perforated flowed at 300 mcfd

No further work has been conducted in Riverside‐1

Large 480 acres structural closure, with follow up

drilling opportunities; gas on rock

personal

Stratigraphic trapping potential - significant upside

Riverside South‐1 drilled later, tight reservoirs

Drilling candidates at Riverside North‐1 and

Riverside South‐2

Excellent frac‐stimulation candidate

Field is mapped on 3D seismic

Plan to drill Riverside North‐1 and frac either

Riverside‐1 or Riverside North‐1

Existing pipeline connects field to Kincora Gas Plant

Aim to place both wells into production by end

2022

Field Gas Riverside

5

r

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Gas2Grid Limited published this content on 01 February 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 01 February 2022 23:08:06 UTC.