Mindax Limited announced that the Phase 1 Reverse Circulation (RC) drilling programme at the Meekatharra North Project has been completed. A total of 18 holes for 2,162m were drilled and assay results for gold have been returned for the programme. The programme encountered challenging ground conditions with ground water ingress affecting sample recovery at depth for some of the holes. The majority of the programme was completed with some holes terminated prematurely when ground water influences prevented further progress. Phase 1 exploration focussed on the northern end of the tenement testing several priority targets located along southern structural corridors interpreted from the Andy Well Mine and within proximity to historic drilling. This previous work returned significant gold intercepts; drilled for Sub Audio Magnetic (SAM) geophysical targets and tested geochemical and biogeochemical survey anomalies. The exploration programme has confirmed the presence and extension of gold mineralised structures or corridors. Several drill holes intersected narrow vein quartz with minor pyrite to wider zones, up to 6m, with variable vein quartz hosted in basalt or dolerite returning anomalous gold mineralisation. The best result was returned from hole MNC-023, intersecting 2m @ 1.21g/t from 120m.