Minera IRL Limited Reports Production Results for the Month of July and Year to Date Ended July 2022
Mineralized material mined and placed on the leach pads between January and July 2022 totaled 2,459,601 tonnes at an average grade of 0.206 grams per tonne and containing 16,299 ounces of gold. As at the end of July 2022, a total of 12,277 ounces of gold have been shipped.