ASX ANNOUNCEMENT
15 July 2022
QUARTERLY ACTIVITIES REPORT - JUNE 2022
HIGHLIGHTS
PILBARA GOLD PROJECTS - Drilling confirms gold and lithium potential | |
Brahman Project | |
only• | Encouraging results received from the first 13 holes totalling 1500m of the planned 5000m Phase 2 Reverse |
use | Circulation drilling program |
The drilling was focused on high priority "Hemi Style" intrusive related and structural gold targets identified | |
• | |
from an assessment of multiple geophysical datasets and multi-element geochemistry | |
• | Proof of concept has been confirmed with the drilling encountering significant widths of previously |
unrecognised Mallina basin sediments | |
• | Gold potential confirmed with broad, coherent, low order gold and multi-element gold pathfinder |
geochemical anomalism reported from several drillholes at the Brahman Project. Significant results | |
include: | |
o 20m @ 2.3ppb Au, 3.1ppm As from 8m depth (21BRC0006), and | |
personal | 4m @ 104ppb Au, 4.6ppm As from 108m depth |
o 40m @ 5.5ppb Au, 11.7ppm As from 36m depth (21BRC0008) | |
o 12m @ 9.1ppb Au, 41.0ppm As from 100m depth (21BRC0012) | |
• | Lithium potential now also confirmed with broad, coherent, low order lithium and multi-element lithium |
pathfinder geochemical anomalism also reported from several drillholes, including: |
o 56m @ 137.5ppm Li, 20.7ppm Cs; 2.0ppm Be, 69.4ppm Rb from 36m depth (21BRC0008) o 40m at 111.4ppm Li, 1.8ppm Cs from 80m depth (21BRC0012)
o 52m @ 76.4ppm Li, 1.2ppm Cs from 16m depth (21BRC0013)
Quartz Hill Project
• Lithium bearing pegmatite confirmed within the Quartz Hill Project located southwest along strike from the
world class Wodgina Deposit, one of the world's largest known hard rock lithium deposits
For
Next Steps
• Geochemical soil surveys are in progress across all project areas to refine and prioritise both gold and lithium targets prior to recommencing drilling
NEW ZEALAND GOLD PROJECTS
- The Company re-commenced its field programs in the Central Otago on the Lammerlaw and OPQ Gold projects in New Zealand
CORPORATE
-
The Company has cash reserves of A$4.181m as at 30 June 2022
_________________________________
NEW AGE EXPLORATION LTD | REGISTERED OFFICE | CONTACT | COMPANY DIRECTORS |
ASX: NAE | Level 2 | T: +613 9614 0600 | Alan Broome (Chairman) |
ACN: 004 749 508 | 480 Collins Street | F: +613 9614 5612 | Joshua Wellisch (Executive Director) |
nae.net.au | Melbourne Vic 3000 | E: info@nae.net.au | Adrien Wing (Director) |
2 | P a g e
New Age Exploration (ASX:NAE) (NAE or the Company) is pleased to provide shareholders with the Company's | |
Quarterly Activities Report for the period ending 30 June 2022. During this quarter, the Company focused its | |
activities on the Brahman and Quartz Hill projects in the Pilbara. Results received to date from the drilling | |
programs confirmed the Company's belief that the Central Pilbara Project has the potential to host significant | |
personaluse only | |
gold and lithium mineral deposits. The Company also re-commenced its field programs in the Central Otago Gold | |
belt in New Zealand and looks forward to delivering strong news flow from these projects over the coming | |
months. | |
PILBARA GOLD PROJECTS - WESTERN AUSTRALIA | |
For | Figure 1. Location of NAE's Central Pilbara Gold and Lithium Projects |
In May, the Company announced it had received results from the first 13 holes of its Phase 2 drilling programme completed at the Company's Brahman Project, and from limited rock chip sampling of lithium pegmatite targets at the Quartz Hill Project, within its extensive Central Pilbara Gold-Lithium Project. (ASX Announcement 25 May 2022)
All of the drilling completed in this most recent campaign was undertaken within the Brahman Project area (E47/3958) which is located north of, and within ~20-30km of De Grey Mining's Mallina Gold Project and the recent Hemi gold discovery (ASX:DEG).
nae.net.au
3 | P a g e
Thirteen Reverse Circulation drillholes for a total of 1506m were completed prior to closure of the 2021 field season. The majority of samples represent four (4) metre composites. Refer to Figures 1 and 2.
The program was designed to follow-up high priority targets defined from its Phase 1 drilling in conjunction with onlya pipeline of new targets identified from recent data synthesis and proprietary data filtering technology undertaken on multiple geophysical data sets by specialist Geophysical Consulting Group, Fathom Geophysics.
(Refer NAE ASX release 28 October 2021).
For usepersonal
Figure 2. Location of NAE's Central Pilbara Brahman and Droughtmaster Gold and Lithium Projects over regional grey scale
aeromagnetics showing recent drilling and areas of planned soil geochemical surveys.
nae.net.au
4 | P a g e
Recent Activities
Brahman Project - Drilling - Gold & Lithium
onlyAll of the drilling completed prior to the closure of the 2021 field season was carried out within the Brahman Project area. The drilling was designed to follow-up a selection of high priority targets defined from the previously reported Phase 1 aircore drilling campaign in conjunction with a pipeline of new targets identified from data synthesis and proprietary data filtering technology undertaken on multiple geophysical data sets by specialist Geophysical Consulting Group, Fathom Geophysics. (Refer NAE ASX release 28 October 2021).
For usepersonal
Figure 3: Brahman Project - Drillhole location plan showing geophysical targets and hole
collar locations over RTP magnetics.
The 2021 campaign comprised thirteen (13) very widely spaced "scout" reverse circulation drillholes (21BRC0001- 21BRC0013) for a total of 1506 metres. Despite the area being shown as granite on existing GSWA map sheets the holes encountered a variety of prospective rock types including granite, granodiorite, Mallina Basin sediments,
nae.net.au
5 | P a g e
cherts/quartzites and mafic-ultramafic intrusives showing abundant quartz-carbonate veining and extensive alteration including strongly developed zones of disseminated and veinlet sulphides (pyrite).
Assay results indicate coherent and largely coincident low level multi-element Gold (IRGS) and Lithium-Caesium-onlyTantalum (LCT) pegmatite pathfinder geochemical anomalism within a number of holes. Figure 3 provides a
drillhole location plan and Figures 4 and 5 provide schematic geological cross-sections.
Reverse circulation drillholes 21BRC0001/0002/0012 and 21BRC0013 were drilled to test a prominent NE trending "linking" structure between the regionally important ENE trending Mallina Shear Zone to the south (host to De Grey's Mallina Gold Project and the recent Hemi discovery) and the Scholl Shear Zone to the north. In the vicinity of holes 21BRC0012 and 21BRC0013 cover thins to provide a rare window into the basement rocks of interest. Mapping at this location revealed the target of interest to comprise a structurally deformed package including
usebrecciated and silicified chert/quartzite, Mallina Basin sediments and mafic-ultramafic intrusives displaying intense stockwork and sheeted quartz veining. Refer to Plates 1-4.
personalForThis setting is similar to the sequence hosting De Grey's Mallina Gold Project and to the tectono-stratigraphic setting at both the Wodgina and Pilgangoora Lithium mining operations where maximum LCT pegmatite development occurs within mafic-ultramafic rock types.
Broad zones of highly anomalous lithium and multi-element lithium pathfinder geochemistry reported within ultramafic rocks at NAE's Brahman Project provide compelling evidence of a well-developed alteration halo emanating from an as yet undiscovered lithium-bearing pegmatite source located in close proximity to these holes.
nae.net.au
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
New Age Exploration Limited published this content on 15 July 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 15 July 2022 05:43:07 UTC.