Nickel Creek Platinum Corp. announced that it intends to conduct a drill program during 2022 at its 100%-owned Nickel Shäw Project (the "Project") located in the Yukon, Canada. An exploration program is planned for the 2022 field season to collect data to facilitate of the completion of a Prefeasibility Study ("PFS").

This work will include PFS drilling on the Wellgreen deposit to support conversion of inferred mineral resources to indicated mineral resources and collect additional geotechnical and hydrogeological data. Additional information will also be collected to characterize proposed waste dump and tailings sites. Further drilling is also planned at the Arch exploration target to define the extent of mineralization.

On November 29, 2021, the Company announced complete results of its 2021 drilling and geophysics program. A series of holes at the Arch Target intersected massive to semi-massive sulphide overlain by significant thicknesses of disseminated sulphides. These intervals graded 0.32% to 1.41% Ni, 0.14% to 0.69% Cu and 0.45 g/t to 2.49 g/t TPM over 12.4m to 23.7m intervals (down-hole core lengths) in nine holes.

The Company will focus the 2022 field program on the PFS support work. This program may be adjusted or amended based on the amount of proceeds received from the Private Placement. The scientific and technical information disclosed in this news release was reviewed and approved by Cam Bell, an independent geologist on a consulting retainer contract with the Company and a "qualified person" as defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects.