Nickel Creek Platinum Corp. announced the overall results from its 2021 drilling and geophysics program which concluded during the month of August 2021 in Yukon, Canada. The drilling component of the 2021 exploration program comprised 12 holes totalling 1,257 metres (m), of which nine holes totalling 974m were drilled from two separate drill platforms on the Arch Target at the Nickel Sh?w Project. As previously announced on October 8, 2021, five of the six holes from the first platform hit intersected massive sulphide intervals, and a second platform was placed ~100m from the first platform following the expected trend of mineralization. Of the three holes drilled from the second platform, one hole hit intersected massive sulphide mineralization and one hole was drilled deep into the hanging wall for borehole electromagnetic (EM) surveying.