NTM Gold Limited provided an update for the 100%-owned Redcliffe Gold Project located near Leonora, Western Australia. Shallow RC drilling at Hub intersects high grades and good widths in oxide, including: 15m @ 8.5 g/t Au from 25m (5m composite), 25m @ 5.4 g/t Au from 20m, incl. 5m @ 20.3 g/t Au (5m composite), and 15m @ 4.9 g/t Au from 20m, incl. 10m @ 6.6 g/t Au (5m composite). Deeper drilling to test grade continuity returned: 10m @ 4.5 g/t Au from 135m (5m composite). RC drilling ongoing as part of +5,000m program. Diamond drilling has commenced with a +400m program testing depth extensions. Two holes testing deeper grade continuity have also returned positive results from initial 5m composites, including: 10m @ 4.5 g/t Au from 135m, and 10m @ 2.6 g/t Au from 105m. The results are from the first eight of a planned 37 hole program. The RC program is expected to continue until Christmas. On completion of the shallower holes, RC drilling will next focus on a number of diamond precollars, before moving to extensional drilling along strike. Diamond drilling has also commenced and is testing for deeper extensions to the gold mineralisation and will also provide valuable geological information.