Pearl Gold AG reported production results for the month ended February 2013. For the month, the company's total of 53,000 tons of ore was provided for treatment during the month, but a significant portion of it (13,000 tons of mainly coarse material and quartz veins averaging 0.9 gm/ton) was diverted to an interim stockpile which has been developed since the commencement of commissioning for later crushing, grinding and extraction of gold contained therein. The grade of material delivered to tailings was, in the view of Wassoul'Or, far too high and thus confirmed the low recuperation.

Several technical issues which have resulted in throughput rates below schedule, A total of 5.6 kg of gold was recovered from the partial treatment applied to the low-grade ore treated, and 14.45 tons of untreated concentrate remains for ILR (In-Leach-Reactor) treatment. Gold content at the beginning of the production process was 0.56 gm/ton and gold content in waste material was 0.20 gm/ton.