Playfair is now drilling the Sæterfjellet MMI target having competed initial drilling at the Røstvangen and Kletten MMI targets. At Røstvangen a total of 544m were drilled in 11 holes while six holes totalling 439m were drilled at Kletten. Drill core logging, cutting, and sampling has been completed at Røstvangen. A total of 88 samples, including blanks, standards and duplicates are being shipped for analysis. Drill core from Kletten has now been moved from the field to facility in Tynset where core logging is in progress. Playfair has made Drill Notifications covering its 2022 drill program at RKV for 33 initial drillholes and up to 107 additional holes for a total of 140 holes dependent on results. All notifications and necessary permits are in place. In 2021 initial drilling was carried out at the Rødalen and Storboren targets, further drilling at Storboren is planned in 2022 following completion of drilling at the Sæterfjellet target. Playfair is using a drilling machine which can be disassembled for moving between drillholes. Although lightweight, the drill is capable of drilling to 150m depth using BQ sized rods (36.5 mm or 1.437 inches core diameter) and to 100m depth using NQ sized rods (47.8mm or 1.872 inches core diameter). Promin AS, a Trondheim-based consultancy with extensive experience in the Norwegian Mining industry,
provides logistical support and experienced geologists.