Range Energy Resources Inc. announced that, Gas Plus Khalakan (GPK), the sole contractor of the Khalakan PSC in the Kurdistan Region of Iraq, issued an end 2017 operations update regarding the Shewashan field. Shewashan #1: Current production rate: 350 bopd and <5% water cut from the Qamchuqa reservoir. Recompletion plans include: perforation and acid stimulation of the Kometan reservoir. Shewashan #2: Current production rate: 650 bopd and low water cut from the Kometan reservoir. Recompletion plans include: Larger acid stimulation in the Kometan to increase the production from perforated intervals (45m) and a possible propped hydraulic frac in the Shiranish reservoir which has yet to be tried in the field. Shewashan #3: Current production rate: 200 bopd and 30% water cut from Kometan formation. Recompletion plans include: isolation of the Qamchuqa reservoir to reduce the water production and further stimulation of the Kometan reservoir. Shewashan #4: Currently producing at low, water free oil rates on a small (12/64") choke from the Kometan. This well produced initially from the Qamchuqa reservoir but due to high water production it was recompleted and stimulated in the Kometan reservoir. Recompletion plans include: much larger acid fracturing on the Kometan or alternatively this well is also a candidate for a propped hydraulic frac in the Shiranish reservoir.