Red Eagle Mining Corporation announced results from ongoing underground stope delineation drilling at the San Ramon Gold Mine, Santa Rosa Gold Project, Antioquia, Colombia. Results from 91 additional underground stope delineation holes have been received (SRDU-0097 to SRDU-0195) with highlights including intersections: Three underground diamond drill rigs have completed 18,359 metres in 207 stope delineation holes with assays pending on holes SRDU-0196 to SRDU-0207.  The results from the current underground production stope delineation drilling continue to return intercepts with grades significantly higher than the reserve grade of 5.2 g/t Au.  Drill assays were composited by length-weighted averaging into intersections using a 2 g/t Au cut-off grade.  Quality Assurance and Quality Control: All technical information for Red Eagle Mining’s Santa Rosa Gold Project is obtained and reported under formal quality assurance and quality control (“QA/QC”) procedures and guidelines.  Red Eagle Mining’s procedures are designed to meet or exceed C.I.M. “Best Practices Guidelines” and National Instrument 43-101 standards of disclosure.  QA/QC protocols for drill core sampling and assaying include the insertion and monitoring of appropriate reference materials (certified standards, blanks and duplicates) to validate the accuracy and precision of the assay results. All drilling samples were collected with a diamond core drilling rig using approximately 0.5 metre sample intervals following industry standard practice.  Activation Laboratories Ltd. prepared and assayed the samples at their laboratory in Medellin, Colombia.  Fire Assay for Au (using a 50 gram sample) with an AAS finish was carried out routinely on all samples submitted.  For all samples which returned initial Au fire assays of greater than 5 g/t, a second Fire Assay for Au was performed (also using a 50 gram sample) with a gravimetric finish.