25 October 2023
During a working trip, General Director of Rosseti Centre, PJSC Igor Makovskiy, as part of a group led by Deputy Director General of PJSC Rosseti Alexey Molsky, inspected energy facilities of the Donetsk and Lugansk People's Republics, Zaporozhye and Kherson regions. Particular attention was paid to fulfilling the instructions of the Russian Ministry of Energy to prepare the regional energy system for the autumn-winter period.

Also, Alexey Molsky and Igor Makovskiy held a special meeting of the Headquarters. The operational situation at the most important production sites that provide power supply to the regions, and the readiness of personnel to work in the upcoming heating season in conditions of increased danger were discussed.

"We discussed a number of key issues in preparation for the autumn-winter period in the new regions. I would like to note the high professional level of the power engineers. Despite all the conditions in which they have to work here, and these are, first of all, increased risks, they came to the beginning of the heating season in full readiness," noted Alexey Molsky.

"The power engineers of Rosseti Centre confirmed that they are ready to promptly collect all the necessary forces and means to promptly fulfill the obligations assigned by the state at the proper level and ensure power supply to residents in any conditions. We have already been through the heating season here and are ready for a new one," emphasized Igor Makovskiy.

Attachments

Disclaimer

IDGC of Centre JSC published this content on 25 October 2023 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 26 October 2023 06:32:36 UTC.