During the repair works power engineers of Slavaynsy branch of Kubanenergo replaced 70 broken pylons. They replaced about 15 kilometres of outdated wire with the new one with larger wire section; this made possible to greatly improve the quality of electricity supply and reduce technical losses. In order to enhance quality, reliability and safety of power supply our specialists replaced old service entrance wires with the new self-supporting insulated wires at 207 houses. The repaired power equipment supplies with electricity Temryuk, several villages: Zaporozhskaya, Fontalovskaya, Starotitorovskaya, Kurchanskaya, Vinogradny, Krasnoarmeisky, Yubileiny, Volna Revolyutsii, Veselovka, Svetly Put and Beliy.

Apart from that, to prepare the electricity network of the Taman peninsula to autumn-winter season specialists of the branch inspected and conducted maintenance works on more than 325 kilometres of 0.4-10kV overhead lines and 84 transformers, cleared the area near power lines from trees and other vegetation.

distributed by