Specialists of Timashevsk branch of "Kubanenergo" PJSC ("Rosseti" group) are implementing a range of activities to get ready for autumn and winter peak loads. Within the last 8 months of this year they have completed more than 80% of the Repair programme 2015.

Since the beginning of the year power engineers have carried out repair and maintenance works on nine 35-110kV substations in Timashevsk power district (Kalininskiy, Bryukhovetskiy, Timashevskiy, Kanevskoy and Primorsko-Aktarskiy districts of the region) and replaced 13 high voltage bushings.

Specialists inspected over 1.4 thousand kilometers of high voltage power lines. They replaced 27 reinforced concrete poles and about 200 insulators.

To provide safe and uninterrupted power supply, our specialists cut vegetation on the territory of more than 18 hectares of 35-110kV power transmission line.

All works were implemented in accordance with the schedule of the repair programme of Kubanenergo for 2015 and are a part of preparation of the power facilities and equipment of the Company to peak loads

distributed by