San Gold Corporation reported preliminary results of operations at its Rice Lake Mining Complex in Manitoba, Canada for the quarter and six months ended June 30, 2013. For the quarter, the company reported gold production of 22,476 ounces. Mine production was 173,350 tons. Mill production was 162,344 tons. The operation mined 173,350 tons of ore at an average daily rate of 1,905 tons per day and milled 162,344 tons in the quarter at an average daily throughput of 1,765 tons per day. Mill recovery was 94.0% and milled grade was 5.05 grams per tonne. The company ended the quarter with approximately 11,000 tons in a low grade stockpile in addition to a blended stockpile of approximately 4,200 tons.

The company reported total gold production for the first six months of the year to 39,830 ounces.

For the year, the company remains on track to produce between 75,000 and 90,000 ounces of gold in 2013 with cash costs between $800 and $900 per ounce.