Please enable cookies or visit: https://www.youtube.com/watch?v=2Xvm9XvokY4

One of our latest projects, the Sellafield Product and Residue Store Retreatment Plant (SRP) project, stands as a testament to our commitment to innovation and excellence in engineering and construction in the nuclear sector. Severfield's project scope includes the connection design, fabrication, and erection of a Nuclear Seismic structure dedicated to the long-term storage and processing of fuel rod containment capsules, involving 2,600 tonnes of structural steelwork.

From Dalton, North Yorkshire, to Sellafield, Cumbria: The journey of steelwork

The journey of our steelwork begins at our largest manufacturing site in Dalton, near Thirsk in North Yorkshire. Here, we begin the process with over a hundred hours of meticulous CAD design, and following the design process, our highly skilled team fabricate the steel components that will play a vital role in the Sellafield SRP project.

A vision for the future

Upon completion, the Sellafield SRP facility will serve as a crucial hub for the repackaging and, where necessary, the re-treatment of special nuclear materials. This function underscores the importance of our work at Severfield in ensuring the safe and sustainable management of nuclear resources.

Attachments

  • Original Link
  • Permalink

Disclaimer

Severfield plc published this content on 04 April 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 04 April 2024 08:39:01 UTC.