Spectrum Metals Limited announced that RC drilling has resumed at its 100% owned Penny West Gold project with the first two holes already completed. Phase II drilling of 54 planned RC holes for 11,000 metres of drilling. 27 holes are planned at Penny North, 12 holes at Magenta and 15 holes between Penny South and Penny West. Hole designs may be varied and additional holes added as drilling progresses and the understanding of the mineral system grows. Planning is currently underway for a geophysical program to target the 1.4 km gap zone between Penny North and Magenta. However continued systematic, results driven, step out drilling will occur in the meantime between these two prospects. A diamond drilling campaign will be designed to complement the current RC program.