Taseko Reports Strong Fourth Quarter Financial Performance and

$190 Million of Adjusted EBITDA for 2023

This release should be read with the Company's Financial Statements and Management Discussion & Analysis ("MD&A"), available at www.tasekomines.comand filed on www.sedar.com. Except where otherwise noted, all currency amounts are stated in Canadian dollars. Taseko's 87.5% owned Gibraltar Mine is located north of the City of Williams Lake in south-central British Columbia. Production and sales volumes stated in this release are on a 100% basis unless otherwise indicated.

March 7, 2024, Vancouver, BC - Taseko Mines Limited (TSX: TKO; NYSE American: TGB; LSE: TKO) ("Taseko" or the "Company") reports full year 2023 Adjusted EBITDA* of $190 million and Earnings from mining operations before depletion and amortization* of $207 million. Revenues for 2023 were $525 million, 34% higher than the prior year as a result of improved copper production and an increase in the Company's effective interest in the Gibraltar Mine, from 75% to 87.5%, in March 2023. Net income for the year was $83 million ($0.29 per share) and Adjusted net earnings* were $44 million ($0.15 per share).

In the fourth quarter, Adjusted EBITDA* was $69 million and Earnings from mining operations before depletion and amortization* was $73 million. Net income for the fourth quarter was $67 million ($0.23 per share) and Adjusted net earnings* was $24 million ($0.08 per share).

Fourth quarter copper production from Gibraltar was 34 million pounds, and for the full year 2023 production was 123 million pounds. Annual production was above the Company's original guidance and also 26% higher than in 2022. Strong production supported lower Total operating cash costs (C1)* of US$1.91 per pound for the fourth quarter and US$2.37 per pound for the year. Molybdenum production for the fourth quarter and year was 369 thousand pounds and 1.2 million pounds, respectively.

Stuart McDonald, President and CEO of Taseko, commented, "The Gibraltar Mine finished a successful year with another strong production quarter. The lower benches of the Gibraltar pit continued to deliver the quality ore we expected, with copper grades averaging 0.27% for the period. This resulted in strong earnings and $63 million of operating cash flow in the fourth quarter. For the full year 2023, the average copper grade was 0.25%, which is in line with Gibraltar's life of mine reserve grade, and led to significantly improved copper production and financial performance compared to 2022.

"At our Florence Copper project we achieved a major milestone in the fourth quarter, as the final Underground Injection Control permit became effective, successfully concluding the EPA's lengthy permitting process. We also announced two Florence project financings totalling US$100 million, from Taurus Mining Royalty Fund and Societe Generale, which supplement the previously announced financings from Mitsui and Bank of America.

We're now moving forward with construction of the commercial production facility at Florence. Initial activities have focused on site preparations, earthworks and civil work for the wellfield as well as hiring additional site personnel for the construction and operations teams. Wellfield drilling commenced in February and construction of the SX/EW plant and other surface infrastructure will begin in the second quarter. First copper production expected in fourth quarter 2025."

Mr. McDonald added, "Taseko is in a very unique position heading into 2024 with a fully permitted, low-cost project that will provide 80% growth to our North American copper production profile in the coming years. Our Gibraltar Mine is expected to continue to benefit from Gibraltar pit ore which will be the main source of mill feed for the first half of this year, before the transition to the Connector pit. In January, we had mill downtime in concentrator #2 for

1

a planned major component replacement, which was successfully completed in the scheduled timeframe. In the second quarter, concentrator #1 will be shut down for roughly three weeks for the in-pit crusher relocation and other mill maintenance. Factoring in the additional down time in 2024, we expect Gibraltar to produce approximately 115 million pounds of copper for the year, with quarterly production less variable than in recent years," concluded Mr. McDonald.

2023 Annual Review

  • Annual cash flow from operations was $151.1 million and net income was $82.7 million ($0.29 per share) for the year;
  • Earnings from mining operations before depletion and amortization* was $207.4 million, Adjusted EBITDA* was $190.1 million and Adjusted net income* was $44.4 million ($0.15 per share);
  • Total operating costs (C1)* for the year was US$2.37 per pound produced;
  • The Gibraltar mine produced 122.6 million pounds of copper and 1.2 million pounds of molybdenum in 2023. Copper recoveries averaged 82.6% and copper head grades were 0.25%;
  • Gibraltar sold 120.7 million pounds of copper for the year (100% basis) which contributed to revenue for Taseko of $525.0 million, the highest annual revenue Taseko has ever recorded. Average realized copper prices were US$3.84 per pound for the year;
  • On March 15, 2023, Taseko acquired 50% of Cariboo Copper Corp. increasing its effective interest from 75% to 87.5% in the Gibraltar mine; and
  • In September, the U.S. Environmental Protection Agency ("EPA") issued the Final Underground Injection Control ("UIC") permit for the Florence Copper Project and the permit became effective on October 31, 2023. The Company now has all key permits in place and is commencing construction of the commercial production facility at Florence.

Fourth Quarter Review

  • Fourth quarter cash flow from operations was $62.8 million and net income was $67.4 million ($0.23 per share) for the quarter;
  • Earnings from mining operations before depletion and amortization* was $73.1 million, Adjusted EBITDA* was $69.1 million, and Adjusted net income* was $24.1 million ($0.08 per share);
  • Gibraltar produced 34.2 million pounds of copper for the quarter. Average head grades were 0.27% and copper recoveries were 82.2% for the quarter;
  • Gibraltar sold 35.9 million pounds of copper in the quarter (100% basis) at an average realized copper price of US$3.75 per pound;
  • Total operating costs (C1)* for the quarter was US$1.91 per pound produced;
  • Construction of the commercial production facility at Florence is advancing with recent site activities focused on site preparations, earthworks and civil work for the commercial wellfield. Wellfield drilling commenced in February and construction of the SX/EW plant and associated surface infrastructure is scheduled to get underway in the second quarter of 2024;

*Non-GAAP performance measure. See end of news release

2

Fourth Quarter Review - Continued

  • During the quarter, the Company closed the first Florence project debt facility with Bank of America for gross proceeds of US$25 million, secured against the SX/EW plant and other equipment;
  • The Company had a cash balance of $96.5 million and has approximately $176 million of available liquidity at December 31, 2023; and
  • On February 2, 2024, the Company closed its US$50 million royalty with Taurus Mining Royalty Fund L.P. ("Taurus") and the Company also received the first US$10 million of the US$50 million Mitsui copper stream financing in January 2024.

Highlights

Three months ended

Year ended

Operating Data (Gibraltar - 100% basis)

December 31,

December 31,

2023

2022

Change

2023

2022

Change

Tons mined (millions)

24.1

22.9

1.2

88.1

88.7

(0.6)

Tons milled (millions)

7.6

7.3

0.3

30.0

30.3

(0.3)

Production (million pounds Cu)

34.2

26.7

7.5

122.6

97.0

25.6

Sales (million pounds Cu)

35.9

25.5

10.4

120.7

101.3

19.4

Three months ended

Year ended

Financial Data

December 31,

December 31,

(Cdn$ in thousands, except for per share amounts)

2023

2022

Change

2023

2022

Change

Revenues

153,694

100,618

53,076

524,972

391,609

133,363

Cash flows provided by (used for) operations

62,835

(946)

63,781

151,092

81,266

69,826

Net income (loss) (GAAP)

67,425

(2,275)

69,700

82,726

(25,971)

108,697

Per share - basic ("EPS")

0.23

(0.01)

0.24

0.29

(0.09)

0.38

Earnings from mining operations before depletion

73,106

37,653

35,453

207,354

106,217

101,137

and amortization*

Adjusted EBITDA*

69,107

35,181

33,926

190,079

109,035

81,044

Adjusted net income*

24,060

7,146

16,914

44,431

1,723

42,708

Per share - basic ("Adjusted EPS") *

0.08

0.02

0.06

0.15

0.01

0.14

On March 15, 2023, the Company increased its effective interest in the Gibraltar Mine from 75% to 87.5% through the acquisition of a 50% interest in Cariboo Copper Corp. The financial results reported in this MD&A include the Company's 87.5% proportionate share of Gibraltar Mine income and expenses for the period March 15 to December 31, 2023 (prior to March 15, 2023 - 75%).

*Non-GAAP performance measure. See end of news release

3

Review of Operations

Gibraltar mine

Operating data (100% basis)

Q4

Q3

Q2

Q1

Q4

YE 2023

YE 2022

2023

2023

2023

2023

2022

Tons mined (millions)

24.1

16.5

23.4

24.1

22.9

88.1

88.7

Tons milled (millions)

7.6

8.0

7.2

7.1

7.3

30.0

30.3

Strip ratio

1.5

0.4

1.5

1.9

1.1

1.3

1.8

Site operating cost per ton milled (Cdn$)*

$9.72

$12.39

$13.17

$13.54

$13.88

$12.16

$11.89

Copper concentrate

Head grade (%)

0.27

0.26

0.24

0.22

0.22

0.25

0.20

Copper recovery (%)

82.2

85.0

81.9

80.7

83.4

82.6

79.5

Production (million pounds Cu)

34.2

35.4

28.2

24.9

26.7

122.6

97.0

Sales (million pounds Cu)

35.9

32.1

26.1

26.6

25.5

120.7

101.3

Inventory (million pounds Cu)

6.9

8.8

5.6

3.7

5.4

5.6

5.4

Molybdenum concentrate

Production (thousand pounds Mo)

369

369

230

234

359

1,202

1,118

Sales (thousand pounds Mo)

364

370

231

225

402

1,190

1,131

Per unit data (US$ per pound produced)*

Site operating costs*

$1.59

$2.10

$2.43

$2.94

$2.79

$2.19

$2.85

By-product credits*

(0.13)

(0.23)

(0.13)

(0.37)

(0.40)

(0.20)

(0.23)

Site operating costs, net of by-product credits*

$1.46

$1.87

$2.30

$2.57

$2.39

$1.99

$2.62

Off-property costs

0.45

0.33

0.36

0.37

0.36

0.38

0.36

Total operating costs (C1)*

$1.91

$2.20

$2.66

$2.94

$2.75

$2.37

$2.98

*Non-GAAP performance measure. See end of news release

4

Operations Analysis

Full Year Results

Gibraltar produced 122.6 million pounds of copper for the year compared to 97.0 million pounds in 2022. The higher production was attributable to improved ore grades and recoveries as the lower benches of the Gibraltar pit provided the expected higher grades and more consistent mineralized zones. Copper grades for the year averaged 0.25% copper compared to 0.20% in 2022 and copper recoveries for 2023 were 82.6% compared to 79.5% in 2022.

A total of 88.1 million tons were mined in the year compared to 88.7 million tons mined in 2022. The strip ratio of

1.3 was lower than the prior year as mining operations were focused in the Gibraltar pit in 2023 which has a lower strip ratio. Ore stockpiles also increased by 9.1 million tons, including oxide ore from the upper benches of the Connector pit.

Total site costs* at Gibraltar of $430.7 million (which includes capitalized stripping of $55.6 million) was $28.3 million higher than 2022, primarily due to higher repairs and maintenance costs and labour costs, partially offset by lower diesel costs and lower grinding media costs.

Molybdenum production was 1.2 million pounds in the year compared to 1.1 million pounds in the prior year. Molybdenum prices strengthened in 2023 with an average molybdenum price of US$24.19 per pound, an increase of 29% compared to the 2022 average price of US$18.73 per pound.

Off-property costs per pound produced* were US$0.38 for the year, which is US$0.02 higher than the prior year primarily due to an increase in treatment and refining charges (TCRC) rates.

Total operating costs per pound produced (C1)* was US$2.37 for the year, compared to US$2.98 in the prior year as shown in the bridge graph below:

*Non-GAAP performance measure. See end of news release

5

Operations Analysis - Continued

Fourth Quarter Results

Gibraltar produced 34.2 million pounds of copper for the quarter which was generally consistent with the prior quarter. Slightly lower throughput of 7.6 million tons was offset by higher grade compared to the prior quarter. Copper grades in the fourth quarter were 0.27%, higher than recent quarters and in line with management expectations as the lower benches of the Gibraltar pit provided higher grades and more consistent mineralized zones.

Copper recoveries in the fourth quarter were 82.2% and were impacted by performance in concentrator #2 prior to a major component replacement that was completed in January.

Total site costs* at Gibraltar of $110.6 million (which includes capitalized stripping of $31.9 million) was $8.6 million higher than the prior quarter due to higher labor cost, grinding media cost and timing of repairs and maintenance. Site operating cost per ton milled* was $9.72 and was lower than the previous quarters in 2023 mainly due to higher capitalized stripping costs.

Molybdenum production was 369 thousand pounds in the fourth quarter. At an average molybdenum price of US$18.64 per pound and the impact of negative price adjustments of $1.8 million for Taseko's 87.5% share, molybdenum generated a by-product credit per pound of copper produced of US$0.13 in the fourth quarter.

Off-property costs per pound produced* were US$0.45 for the fourth quarter reflecting higher sales, higher ocean freight costs (including bunker fuel) and increased TCRCs compared to the same quarter in the prior year.

Total operating costs per pound produced (C1)* was US$1.91 for the quarter and was lower than the previous quarter due to increased waste stripping costs being capitalized from the Connector pit.

Gibraltar Outlook

The Gibraltar pit will continue to be the main source of mill feed for the first half of 2024 before mining of ore transitions into the Connector pit in the second half of the year. Stripping activity will continue to be focused in the Connector pit, and further oxide ore from this pit is expected to be added to the leach pads in 2024. Restart of the SX/EW facility at the Gibraltar mine is expected in 2026.

Concentrator #2 had additional downtime in January 2024 for a planned major component replacement, and concentrator #1 is scheduled to be down for three weeks in June for the in-pit crusher relocation and other mill maintenance. After taking into account the reduced mill availability from these two scheduled down times, total copper production at Gibraltar for 2024 is expected to be approximately 115 million pounds.

The estimated remaining capital cost of the crusher relocation project is $10 million, and no other significant capital projects are planned for Gibraltar in 2024.

The Company continues to purchase options to provide copper price and fuel price protection. Currently, the Company has copper put contracts in place that secure a minimum copper price of US$3.25 per pound for 42 million pounds of copper and diesel call options for 12.5 million litres of diesel, covering the first half of 2024.

*Non-GAAP performance measure. See end of news release

6

Florence Copper

On September 14, 2023, the Company received the final UIC permit from the EPA, and the UIC permit became effective on October 31, 2023. The Company now has all the key permits in place for the commercial production facility and is commencing construction.

Site activities to-date have focused on site preparations, earthworks and civil work for the commercial wellfield and the hiring of additional management and site personnel positions for the construction and operations teams. The initial drilling contracts have been awarded and finalized, and drilling of the commercial facility wellfield commenced in February.

The Company recently executed a fixed-price contract with the general contractor for construction of the SX/EW plant and associated surface infrastructure which is scheduled to commence in the second quarter of 2024. All the major plant components are on site and the early work on detailed engineering and procurement of long-lead items has significantly de-risked the construction schedule. First copper production is expected in the fourth quarter of 2025.

The Company has advanced Florence project level financing to fund construction. In the fourth quarter, the Company closed a US$25 million equipment loan with Bank of America. In January 2024, the Company received the initial US$10 million deposit from the US$50 million streaming transaction with Mitsui. The remaining amounts will be paid on a quarterly basis in US$10 million instalments. On February 2, 2024, the Company closed a US$50 million royalty with Taurus, which was funded in one lump-sum payment at that time. Additionally, in October 2023, the Florence project received a credit committee approved commitment from Societe Generale for a US$50 million project debt facility with an additional US$25 million uncommitted accordion feature.

In March 2023, the Company announced the results of recent technical work and updated economics for the Florence Copper project. The Company has a technical report entitled "NI 43-101 Technical Report Florence Copper Project, Pinal County, Arizona" dated March 30, 2023 (the "Technical Report") on SEDAR. The Technical Report was prepared in accordance with NI 43-101 and incorporates updated capital and operating costs (with a basis as of Q3 2022) for the commercial production facility and refinements made to the operating models, based on the Production Test Facility ("PTF") results.

Florence Copper Project Highlights:

  • Net present value of US$930 million (after-tax at an 8% discount rate)
  • Internal rate of return of 47% (after-tax)
  • Payback period of 2.6 years
  • Operating costs (C1) of US$1.11 per pound of copper
  • Annual production capacity of 85 million pounds of LME grade A cathode copper
  • 22 year mine life
  • Total life of mine production of 1.5 billion pounds of copper
  • Total estimated initial capital cost of US$232 million remaining
  • Long-termcopper price of US$3.75 per pound

7

Long-term Growth Strategy

Taseko's strategy has been to grow the Company by acquiring and developing a pipeline of complementary projects focused on copper in stable mining jurisdictions. We continue to believe this will generate long-term returns for shareholders. Our other development projects are located in British Columbia.

Yellowhead Copper Project

Yellowhead Mining Inc. ("Yellowhead") has an 817 million tonnes reserve and a 25-year mine life with a pre-tax net present value of $1.3 billion at an 8% discount rate using a US$3.10 per pound copper price based on the Company's 2020 NI 43-101 technical report. Capital costs of the project are estimated at $1.3 billion over a 2-year construction period. During the first 5 years of operation, the copper equivalent grade will average 0.35% producing an average of 200 million pounds of copper per year at an average C1* cost, net of by-product credit, of US$1.67 per pound of copper produced. The Yellowhead copper project contains valuable precious metal by-products with 440,000 ounces of gold and 19 million ounces of silver with a life of mine value of over $1 billion at current prices.

The Company is preparing to advance into the environmental assessment process and is undertaking some additional engineering work in conjunction with ongoing engagement with local communities including First Nations. The Company is also collecting baseline data and modeling which will be used to support the environmental assessment and permitting of the project.

New Prosperity Gold-Copper Project

In late 2019, the Tŝilhqot'in Nation, as represented by Tŝilhqot'in National Government, and Taseko Mines Limited entered into a confidential dialogue, with the involvement of the Province of British Columbia, seeking a long-term resolution of the conflict regarding Taseko's proposed copper-gold mine previously known as New Prosperity, acknowledging Taseko's commercial interests and the Tŝilhqot'in Nation's opposition to the project.

This dialogue has been supported by the parties' agreement, beginning December 2019, to a series of standstill agreements on certain outstanding litigation and regulatory matters relating to Taseko's tenures and the area in the vicinity of Teztan Biny (Fish Lake).

The dialogue process has made meaningful progress in recent months but is not complete. The Tŝilhqot'in Nation and Taseko acknowledge the constructive nature of discussions, and the opportunity to conclude a long-term and mutually acceptable resolution of the conflict that also makes an important contribution to the goals of reconciliation in Canada.

In March 2024, Tŝilhqot'in and Taseko formally reinstated the standstill agreement for a final term, with the goal of finalizing a resolution before the end of this year.

Aley Niobium Project

Environmental monitoring and product marketing initiatives on the Aley niobium project continue. The converter pilot test is ongoing and is providing additional process data to support the design of the commercial process facilities and will provide final product samples for marketing purposes. The Company has also initiated a scoping study to investigate the potential production of niobium oxide at Aley to supply the growing market for niobium-based batteries.

8

Environmental, Social and Governance ("ESG")

Nothing is more important to Taseko than the safety, health and well-being of our workers and their families. Taseko places a high priority on the continuous improvement of performance in the areas of employee health and safety at the workplace and protection of the environment.

The full report is available on the Company's website at https://tasekomines.com/sustainability/overview/.

Taseko's 2023 ESG report will be published in the second quarter of 2024.

Market Review

Copper

Molybdenum

Canadian/US Dollar Exchange

Prices (USD per pound for Commodities)

(Source Data: Bank of Canada, Platts Metals, and London Metals Exchange)

Copper prices are currently around US$3.90 per pound, compared to US$3.84 per pound at December 31, 2023. Short-term volatility in copper prices is expected to continue in the near term due to macroeconomic uncertainty, geopolitical events and recessionary risks from higher interest rates which is causing a slowdown in industrial demand.

Electrification of transportation and the focus on government investment in construction and infrastructure including initiatives focused on the renewable energy, electrification and meeting net zero targets by 2050, are inherently copper intensive and supports higher copper prices in the longer term. According to S&P Global's copper market outlook report published in July 2022, titled 'The Future of Copper: Will the looming supply gap short-circuitthe energy transition?', global demand for copper is projected to double from approximately 25 million metric tons today to roughly 50 million metric tons by 2035, a record high that will be sustained and continue to grow to 53 million metric tons by 2050, in order to achieve net-zero targets. All of these factors continue to provide unprecedented catalysts for higher copper prices in the future as new mine supply lags growth in copper demand.

Approximately 4% of the Company's revenue is made up of molybdenum sales. During the fourth quarter of 2023, the average molybdenum price was US$18.64 per pound. Molybdenum prices are currently around US$20 per pound. Molybdenum demand and prices have been driven by supply challenges at large South American copper mines that produce molybdenum as a by-product. Continued strong demand from the energy sector has boosted demand for alloyed steel products, as well as growing demand from the renewables and military sectors. The Company's sales agreements specify molybdenum pricing based on the published Platts Metals reports.

Approximately 80% of the Gibraltar mine's costs are Canadian dollar denominated and therefore, fluctuations in the Canadian/US dollar exchange rate can have a significant effect on the Company's financial results.

9

The Company will host a telephone conference call and live webcast on Friday, March 8, 2024 at 11:00 a.m. Eastern Time (8:00 a.m. Pacific Time) to discuss these results. After opening remarks by management, there will be a question and answer session open to analysts and investors.

To join the conference call without operator assistance, you may pre-register at https://emportal.ink/41ycQtMto receive an instant automated call back just prior to the start of the conference call. Otherwise, the conference call may be accessed by dialing 888-390-0546 toll free, 416-764-8688 in Canada, or online at tasekomines.com/investors/events.

The conference call will be archived for later playback until March 15, 2024 and can be accessed by dialing 888- 390-0541 toll free, 416-764-8677 in Canada, or online at tasekomines.com/investors/events/and using the entry code 758609#.

For further information on Taseko, please see the Company's website at www.tasekomines.comor contact:

Brian Bergot, Vice President, Investor Relations - 778-373-4554, toll free 1-800-667-2114

Stuart McDonald

President & CEO

10

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Taseko Mines Limited published this content on 08 March 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 08 March 2024 00:48:05 UTC.