Altera Infrastructure has been awarded contracts for redeployment of the FPSO Voyageur Spirit and the shuttle tanker Nordic Brasilia for the Baleine Phase 2 project, located offshore Cote d'Ivoire. The vessels are set for deployment on the Baleine field with a 15-year firm contract. The development of the project will be on a fast-track schedule with a planned start-up date for Phase 2 in the fourth quarter 2024.

The vessels, Voyageur Spirit and Nordic Brasilia, are currently undergoing life extension work and field specific modifications at Drydocks World in Dubai. Voyageur Spirit is a cylindrical shaped FPSO, that previously operated on the Huntington field in the North Sea until 2020. The shuttle tanker Nordic Brasilia will be converted into an FSO to provide additional storage capacity to the Voyageur FPSO.

Altera will own and operate both vessels. The development of Baleine is Africa?s first net zero emissions project ? (Scope 1 and 2) and Altera is excited to join Eni in moving the industry forward by focusing on more sustainable developments.