For personal use only

TRIANGLE ENERGY (GLOBAL) LIMITED

ABN 52 110 411 428

I N T E R I M F I N A N C I A L R E P O R T

For the six months ended 31 December 2021

For personal use only

CORPORATE DIRECTORY

DIRECTORS

Mr Greg Hancock (Non-Executive Chairman)

Mr Conrad Todd (Managing Director)

Mr Mike Collins (Non-Executive Director)

COMPANY SECRETARY

Mr Henko Vos

REGISTERED OFFICE

Suite 2, Ground Floor, 100 Havelock Street, WEST PERTH, WA 6005, Australia

Tel:

+61 (0)8 9219 7111

Email:

admin@triangleenergy.com.au

Web:

www.triangleenergy.com.au

PRINCIPAL PLACE OF BUSINESS

Australia (Head Office):

Suite 2, Ground Floor, 100 Havelock Street, WEST PERTH, WA 6005, Australia

BANKERS

Westpac Banking Corporation

275 Kent Street Sydney NSW 2000, Australia

SECURITIES EXCHANGE LISTING

ASX Limited

20 Bridge Street Sydney NSW 2000, Australia

ASX Code: TEG

SHARE REGISTRY

Automic

Level 2, 267 St Georges Terrace, Perth WA 6000, Australia

Tel:

1300 288 664 (within Australia)

Tel:

+61 (8) 9324 2099 (outside Australia)

Email:

hello@automic.com.au

Web:

www.automic.com.au

AUDITORS

HLB Mann Judd (WA Partnership)

Level 4, 130 Stirling Street, PERTH WA 6000, Australia

SOLICITORS

Hamilton Locke

Level 27, Central Park, 152/158 St Georges Terrace, Perth WA 6000, Australia

1

DIRECTORS' REPORT

C O N T E N T S

only

Directors' Report

Auditor's Independence Declaration

Interim Financial Report

Condensed Consolidated Statement of Profit or Loss and Other Comprehensive Income

use

Condensed Consolidated Statement of Financial Position

Condensed Consolidated Statement of Cash Flows

Condensed Consolidated Statement of Changes in Equity

Condensed Notes to the Consolidated Interim Financial Statements

Directors' Declaration

For personal

Independent Auditor's Review Report

3

15

16

17

18

19

20

37

38

2

For personal use only

DIRECTORS' REPORT

The Directors present the interim financial report of Triangle Energy (Global) Limited (the Company, Group, Consolidated Entity or TEG) for the half-year ended 31 December 2021 and the Auditor's review report therein:

Directors

The Directors of the Company at any time during or since the end of the interim period and until the date of this report are noted below.

Mr Greg Hancock (Non-Executive Chairman) - appointed 14 February 2022, Chairman 15 February 2022 Mr Conrad Todd (Managing Director) - appointed 14 February 2022, Managing Director 15 February 2022 Mr Mike Collins (Non-Executive Director) - appointed 14 February 2022

Mr Timothy Monckton (Non-Executive Chairman) - resigned 14 February 2022

Mr Robert Towner (Managing Director) - resigned 8 February 2022

Mr Wai-lid Wong (Non-Executive Director) - resigned 8 February 2022

Mr Malcolm King (Non - Executive Director) - resigned 14 February 2022

Ms Deanna Carpenter (Non - Executive Director) - resigned 14 February 2022

REVIEW OF OPERATIONS

Company Overview

Triangle is an oil production and exploration company based in Perth, Western Australia. The Company currently holds a 78.75% interest in, and is the Registered Operator of, the producing Cliff Head Oil Field (WA-31-L) located in the Perth Basin.

Further, the Company has a 45% joint venture interest in Licence TP-15 which includes the Xanadu-1 oil discovery, a 50% participating interest in Production Licence L7(R1). With an agreement to purchase the remaining 50% in L7 and 86.94% in Exploration Permit 437, subject to Completion1. All permits are in the Perth Basin.

The Company holds 23.96% equity interest in Australian Securities Exchange-listed State Gas Limited (ASX:GAS) which has a 100% operating interest in the Reid's Dome production Licence PL 231 and Rolleston-West (ATP 2062) in Queensland.

Triangle has twelve years of operational experience in the oil and gas sector. The Company has a track record of performing ahead of industry averages in safety performance and will continue to pursue the highest standards in HSE.

Cliff Head, Perth Basin, Western Australia

The Cliff Head Oil Field (Cliff Head) is located approximately 300 kilometres north of Perth and 12 kilometres off the coast of Dongara in Western Australia at a water depth of 15-20 metres. The Production Licence WA-31-L covers 72km² and the oil field covers 6km². It was the first commercial oil discovery developed in the offshore Perth Basin with a development cost of AU$327m and first oil production commencing in May 2006.

Ownership/Operatorship

Triangle has a majority 78.75% interest in, and is the Registered Operator of, the producing Cliff Head Oil Field.

The Company is committed to maintaining the Cliff Head onshore and offshore infrastructure. The investment in infrastructure supports future anticipated increases in field production and enables the handling of regional oil through the Arrowsmith Stabilisation Plant (Arrowsmith: ASP) which has a nameplate capacity to process 15,000 barrels of oil per day.

1 In January 2021. The Company and Key Petroleum entered into a Sale and Purchase Agreement for the acquisition of Key Petroleum's 50% participating interest in Production Licence L7(R1) and 86.94% interest in Exploration Permit EP 437.

3

For personal use only

DIRECTORS' REPORT

REVIEW OF OPERATIONS (continued)

Production

Production in the Cliff Head Oil Field is from five electric submersible pump production wells. Produced crude oil is processed at ASP and is trucked to the BP facilities in Kwinana, 42kms south of Perth. This arrangement will cease in April 2022. The Cliff Head JV is currently working on alternate oil export solutions.

Prior to the start of the financial period, the Company planned for the Cliff Head 11 Water Injector slickline intervention and Cliff Head 6 workover. On 29 July 2021, the Company announced the successful completion of the slickline intervention. It was expected that the reconfiguration of the injection zone will contribute to increased oil recovery. Subsequently, on 24 August 2021, the completion of Cliff Head 6 electric submersible pump workover was announced.

It was expected that the additional production associated with Cliff Head 6 well was to stabilise at approximately 120 barrels of oil per day. The joint campaigns provide the Company with the rare opportunity to evaluate the condition of the downhole completion and the wellbore equipment with regard to long term well integrity and corrosion management.

On 28 September 2021, a downhole electrical fault caused a shut-in on the Cliff Head 10 well. The well had produced reliably for nearly 12 years with the same electric submersible pump which exceeded the field average of four years. The Cliff Head Joint Venture (Cliff Head JV) has experts optimising the performance and production from Cliff Head who have been assessing possible scenarios in relation to the Cliff Head 10 well which range from replacing the electric submersible pump to a possible updip sidetrack well.

As at 31 December 2021 the field has produced 16.70 million barrels of oil (mmbbls) and continues to produce at above originally forecast rates.

Oil sales revenue from 1 July 2021 to 31 December 2021 was US$8.9 million (Cliff Head JV 100%) for a volume of 117,948 barrels of crude oil. Average production rate for the period is 699 barrels of oil per day.

Facilities and Infrastructure

The Cliff Head Alpha Platform and Arrowsmith Stabilisation Plant is the only offshore and operational onshore infrastructure in the highly prospective and under-explored Perth Basin. These infrastructures are important for any exploration success or development in the surrounding area. The unmanned platform in 15m to 20m of water with a 14km pipeline, carries the crude oil to a dedicated stabilisation processing plant at Arrowsmith. The crude oil is presently trucked 350km to BP in Kwinana. The Arrowsmith stabilisation processing plant has the capacity to process third party crude.

The remotely operated unmanned offshore platform has five production wells and three water injection wells. The two 14km, 250mm diameter pipelines connect the offshore platform to the onshore crude stabilisation plant. The facility operates on a closed loop water re-injection system.

4

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Triangle Energy (Global) Limited published this content on 14 March 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 14 March 2022 21:38:40 UTC.