West Red Lake Gold Mines Ltd. reported final drill results from the 2023 drilling campaign at its 100% owned Rowan Property located in the prolific Red Lake Gold District of Northwestern Ontario, Canada. The Rowan drill holes highlighted in this news release were focused on infilling gaps in the geologic model between the East and West Zones, as well as infill and expansion at depth on the West Zone ore shoot. Most of the historic production at the Rowan Mine was from the West ore shoot area - mainly concentrated on Veins 103 & 104.

Notably, hole RLG-23-177 was successful in intercepting 4.0m @ 9.5 g/t Au approximately 80m beneath the historic workings, demonstrating the down-plunge potential that still exists in the West Zone. Hole RLG-23-177 Intersected 4.0m @ 9.5 g/t Au, from 212m to 216m, Including 0.75m @ 25.20 g/t Au, from 212m to 212.75m, Also including 1.1m @ 13.0 g/t Au, from 213.25m to 214.35m. Hole RLG-23-175 Intersected 2.7m @ 3.66 g/t Au, from 211m to 213.7m, Including 0.7m @ 13.41 g/t Au, from 213m to 213.7m; And 3.6m @ 3.13 g/t Au, from 221m to 224.6m, Including 0.5m @ 20.01 g/t Au, from 223.6m to 224.1m; And 9.0m @ 3.25 g/t Au, from 255m to 264m, Including 0.5m @ 51.67 g/t Au, from 259.9m to 260.4m.

Hole RLG-23-174 Intersected 1.0m @ 12.21 g/t Au, from 185m to 186m; And 2.0m @ 10.84 g/t Au, from 406m to 408m, Including 0.5m @ 42.60 g/t Au, from 406m to 406.5m. Hole RLG-23-179 Intersected 1.0m @ 16.19 g/t Au, from 420m to 421m, Including 0.5m @ 31.65 g/t Au, from 420.5m to 421m. Hole RLG-23-180 Intersected 3.5m @ 3.22 g/t Au, from 92.5m to 96.0m, Including 0.55m @ 15.90 g/t Au, from 93.95m to 94.50m; And 2.0m @ 6.09 g/t Au, from 203m to 205m, Including 0.6m @ 19.99 g/t Au, from 203.7m to 204.3m.

Hole RLG-23-173 Intersected 0.5m @ 17.78 g/t Au, from 218.5m to 219m. Hole RLG-23-176C Intersected 1.5m @ 3.93 g/t Au, from 281m to 282.5m, Including 0.5m @ 10.68 g/t Au, from 282m to 282.5m. Drilled a total of 62 holes for 20,211.4m of NQ diamond drill core at the Rowan Mine deposit ?

highlights announced from the 2023 drilling include: 70.80 g/t Au over 8.3m in hole RLG-23-163B, 50.52 g/t Au over 4.0m in hole RLG-23-149B 66.66 g/t Au over 2.0m in hole RLG-23-153, 45.20 g/t Au over 2.0m in hole RLG-23-166B and 10.34 g/t Au over 8.0m in hole RLG-23-134.