Heading 1

asx release


14 April 2015

TRAFFIC AND REVENUE DATA - MARCH 2015

Transurban has today announced its traffic and revenue data for the March quarter 2015.
For the March quarter, on a statutory basis, toll revenue increased by 69.6% to $376.0 million when compared to the prior corresponding period (pcp). Proportional toll revenue, which Transurban believes is the most accurate reflection of the portfolio's performance, increased by 41.6% from the pcp, to $387.6 million.
The pcp did not include Cross City Tunnel or Queensland Motorways, which were acquired on 26
June, 2014 and 2 July, 2014 respectively. Transurban has a 62.5% interest in Queensland Motorways and owns 100% of Cross City Tunnel. Excluding the contribution from these acquisitions, on a statutory basis, toll revenue increased by 10.0% to $244.0 million when compared to the pcp. Proportional toll revenue increased by 11.3% to $304.8 million during the same period.
Strong traffic growth was observed across all Transurban networks. The Sydney network grew 8.1% for the quarter compared to the pcp, with the M2 and M5 enhancements continuing to drive growth across the network. The Melbourne network traffic grew by 4.2% compared to the pcp. Traffic on the Brisbane network grew 3.5% compared to the pcp, despite weather impacts associated with Cyclone Marcia. Transurban estimates that normalised growth on the Brisbane network, which removes the impact of the cyclone, was 4.4% for the period compared to the pcp.
In Northern Virginia, USA, the 95 Express Lanes project completed its first full quarter of operations. Traffic and revenue results for the quarter continue to perform well against expectations despite significant weather events in Northern Virginia, resulting in a seasonally unfavourable impact on traffic volumes during the period.
Other network highlights for the period included:

Sydney

For the March 2015 quarter, Sydney proportional toll revenue increased 21.7%1 to $165.6 million. ADT (100% of all assets) increased 8.1% to 583,925 trips. The result was favourably impacted by the absence of upgrade works that dampened the pcp results.

Average workday traffic increased 7.9% and average weekend/public holiday traffic increased

8.9%.

Of total ADT, car traffic increased 8.2% and truck traffic increased 7.4% for the quarter.

ADT growth was 10.7% on the M5 South West Motorway for the quarter reflecting the benefit of the additional capacity delivered by the widening project, completed in December 2014.

M5 South West Motorway also moved to a quarterly toll increase regime on 1 January, 2015 , replacing the previous regime which lifted tolls in 50c increments only.

1 Transurban acquired 100% ownership of Cross City Tunnel on 26 June, 2014, and as such CCT did not contribute to revenue in the pcp. Excluding CCT from the March 2015 quarter, Sydney proportional toll revenue grew by 11.7% and ADT increased by

8.4%.

Classification Transurban Group Transurban International Limited ABN 90 121 746 825

Transurban Holdings Limited

ABN 86 098 143 429

Transurban Holding Trust

ABN 30 169 362 255

ARSN 098 807 419

www.transurban.com.au

Level 23

Tower One, Collins Square

727 Collins Street

Docklands VIC 3008

Australia

Telephone +613 9612 6999

Facsimile +613 9649 7380

Level 9

1 Chifley Square

Sydney NSW 2000

Australia

Telephone +612 9254 4900

Facsimile +612 9254 4990

asx release

Lane Cove Tunnel, M5 South West Motorway and Westlink M7 all increased their truck toll multipliers during the quarter - all three assets are progressively moving towards a truck toll multiplier of 3 times car tolls, with gradual uplifts each quarter until this target is reached.

The average daily tolled vehicle kilometres travelled on the M7 increased by 8.7% to 2.122 million kilometres compared to the pcp.

Construction of the NorthConnex tunnel commenced in February 2015 after Transurban announced financial close in January 2015.

Melbourne

For the March 2015 quarter, Melbourne toll revenue increased 9.6% to $143.0 million. ADT increased 4.2% to 813,303 transactions. The result was favourably impacted due to the closure of the Burnley Tunnel for resurfacing works in the pcp.

Average workday traffic increased 3.0% and average weekend/public holiday traffic increased

7.8%.

Of total ADT, car traffic increased 3.8% and truck traffic increased 6.8%.

From a sectional perspective, Southern Link grew 4.5% for the quarter, with Western Link up

3.9%.

Brisbane

For the March 2015 quarter, Brisbane proportional toll revenue increased 7.2% to $60.4 million. ADT (100% of all assets) increased 3.5% to 300,579 trips.

Average workday traffic increased 4.1% and average weekend/public holiday traffic increased

1.6% for the quarter.

Of total ADT, car traffic increased 3.3% and truck traffic increased 4.3% for the quarter.

Logan Motorway benefited from the completion of the pavement rectification works westbound in October 2014. For the March 2015 quarter, Logan Motorway toll revenue increased 7.5% to

$35.9 million. ADT increased 4.0% to 151,129 trips.

Cyclone Marcia impacted the Brisbane network across the weekend of 20 February, 2015.

Transurban estimates that normalised growth, which removes the impact of the cyclone on the Logan Motorway and Gateway Motorway, was 4.6% and 4.9% respectively for the quarter compared to the pcp.

Legacy Way is expected to commence operations in mid-2015.

Northern Virginia

495 Express Lanes continued to experience strong traffic and revenue growth. Average workday toll revenue for the quarter grew 13.1% to US$124,531. The average dynamic toll price for the quarter was US$3.00, with a maximum dynamic toll of US$15.05.

95 Express Lanes continued to perform well against expectations following the commencement of operations in December 2014. Average workday revenue for the quarter was $134,242. The average dynamic toll price for the quarter was US$4.52, with a maximum dynamic toll of US$20.90.

Classification Transurban Group Transurban International Limited ABN 90 121 746 825

Transurban Holdings Limited

ABN 86 098 143 429

Transurban Holding Trust

ABN 30 169 362 255

ARSN 098 807 419

www.transurban.com.au

Level 23

Tower One, Collins Square

727 Collins Street

Docklands VIC 3008

Australia

Telephone +613 9612 6999

Facsimile +613 9649 7380

Level 9

1 Chifley Square

Sydney NSW 2000

Australia

Telephone +612 9254 4900

Facsimile +612 9254 4990

asx release

Significant weather events in Northern Virginia during the quarter resulted in a seasonally unfavourable impact on traffic volumes.

Full traffic and revenue information for the March quarter and FY15 year to date is attached.

Amanda Street

Company Secretary

Investor enquiries Henry Byrne

General Manager, Investor Relations and Corporate Affairs
+61 438 564 245

Classification Transurban Group Transurban International Limited ABN 90 121 746 825

Transurban Holdings Limited

ABN 86 098 143 429

Transurban Holding Trust

ABN 30 169 362 255

ARSN 098 807 419

www.transurban.com.au

Level 23

Tower One, Collins Square

727 Collins Street

Docklands VIC 3008

Australia

Telephone +613 9612 6999

Facsimile +613 9649 7380

Level 9

1 Chifley Square

Sydney NSW 2000

Australia

Telephone +612 9254 4900

Facsimile +612 9254 4990

asx release



Appendix 1 - Traffic and revenue performance2

March quarter

Proportional Toll revenue

% change

ADT

% change

Melbourne

9.6%

4.2%3

Sydney4

21.7%

8.1%

Brisbane

7.2%

3.5%

Northern Virginia

124.8%

129.2%

YTD FY15

Proportional Toll revenue

% change

ADT

% change

Melbourne

8.0%

3.0%3

Sydney4

21.3%

6.7%

Brisbane5

16.4%

1.7%

Northern Virginia

56.1%

123.8%

2 All percentage changes are to the prior corresponding period.

3 CityLink traffic is calculated on Average Daily Transactions (ADT). All other assets are calculated on Average Daily Trips.

4 Transurban acquired 100% ownership of Cross City Tunnel on 26 June, 2014. Toll revenue data and comparisons prior to

Transurban ownership are not provided.

5 Queensland Motorways reached financial close for Clem7 and Go Between Bridge on 13 December 2013 and 24 December

2013, respectively. As a result these assets were only included for part of the pcp.

Classification Transurban Group Transurban International Limited ABN 90 121 746 825

Transurban Holdings Limited

ABN 86 098 143 429

Transurban Holding Trust

ABN 30 169 362 255

ARSN 098 807 419

www.transurban.com.au

Level 23

Tower One, Collins Square

727 Collins Street

Docklands VIC 3008

Australia

Telephone +613 9612 6999

Facsimile +613 9649 7380

Level 9

1 Chifley Square

Sydney NSW 2000

Australia

Telephone +612 9254 4900

Facsimile +612 9254 4990

asx release

Appendix 2 - Traffic and revenue data - March quarter

Asset

Ownership

Mar 15 quarter

Mar 14 quarter

%

change

YTD FY15

YTD FY14

%

change

CityLink

100%

Total Toll Revenue

($AUDm) (net of GST)

$143

$131

9.6%

$432

$400

8.0%

CityLink

100%

Average Daily Transactions ('000)

813

780

4.2%

817

793

3.0%

Hills M2

100%

Total Toll Revenue

($AUDm) (net of GST)

$55

$48

12.7%

$165

$143

15.6%

Hills M2

100%

Average Daily

Trips ('000)

116

105

10.9%

116

103

12.0%

Lane Cove Tunnel/ MRE

100%

Total Toll Revenue

($AUDm) (net of GST)

$18

$17

9.5%

$56

$51

9.9%

Lane Cove Tunnel/ MRE

100%

Average Daily

Trips ('000)

80

75

6.1%

81

76

6.5%

Cross City Tunnel6

100%

Total Toll Revenue

($AUDm) (net of GST)

$14

N/A

N/A

$41

N/A

N/A

Cross City Tunnel6

100%

Average Daily

Trips ('000)

37

36

3.7%

37

36

0.9%

M1 Eastern

Distributor

75.1%

Total Toll Revenue

($AUDm) (net of GST)

$28

$26

7.4%

$84

$79

6.6%

M1 Eastern

Distributor

75.1%

Average Daily

Trips ('000)

53

52

3.0%

53

52

1.9%

Westlink M7

50%

Total Toll Revenue

($AUDm) (net of GST)

$65

$57

14.4%

$192

$171

11.8%

Westlink M7

50%

Average Daily

Trips ('000)

164

152

8.0%

164

153

7.2%

M5 South West

Motorway

50%

Total Toll Revenue

($AUDm) (net of GST)

$51

$46

11.5%

$149

$140

6.8%

M5 South West

Motorway

50%

Average Daily

Trips ('000)

133

120

10.7%

128

121

5.6%

6 Transurban acquired 100% ownership of Cross City Tunnel on 26 June, 2014. Toll revenue data and comparisons prior to

Transurban ownership are not provided.

Classification Transurban Group Transurban International Limited ABN 90 121 746 825

Transurban Holdings Limited

ABN 86 098 143 429

Transurban Holding Trust

ABN 30 169 362 255

ARSN 098 807 419

www.transurban.com.au

Level 23

Tower One, Collins Square

727 Collins Street

Docklands VIC 3008

Australia

Telephone +613 9612 6999

Facsimile +613 9649 7380

Level 9

1 Chifley Square

Sydney NSW 2000

Australia

Telephone +612 9254 4900

Facsimile +612 9254 4990

asx release

Asset

Ownership

Mar 15 quarter

Mar 14 quarter

%

change

YTD FY15

YTD FY14

%

change

Gateway Motorway

62.5%

Total Toll Revenue

($AUDm) (net of GST)

$46

$43

7.3%

$141

$132

6.5%

Gateway Motorway

62.5%

Average Daily

Trips ('000)

111

107

3.6%

112

108

3.4%

Logan Motorway

62.5%

Total Toll Revenue

($AUDm) (net of GST)

$36

$33

7.5%

$109

$105

3.7%

Logan Motorway

62.5%

Average Daily

Trips ('000)

151

145

4.0%

151

149

0.8%

Go Between Bridge7

62.5%

Total Toll Revenue

($AUDm) (net of GST)

$3

$3

9.8%

$9

$3

219.3%

Go Between Bridge7

62.5%

Average Daily

Trips ('000)

12

11

3.1%

12

12

1.7%

Clem78

62.5%

Total Toll Revenue

($AUDm) (net of GST)

$12

$11

5.1%

$35

$12

182.2%

Clem78

62.5%

Average Daily

Trips ('000)

27

27

0.4%

27

27

(0.5%)

495 Express Lanes

94%9

Total Toll Revenue

($USDm)

$8

$6

41.2%

$25

$16

54.7%

495 Express Lanes

94%9

Average Daily

Trips ('000)

33

29

16.0%

35

30

15.6%

95 Express Lanes

77.5%10

Total Toll Revenue

($USDm)

$9

N/A

N/A

$9

N/A

N/A

95 Express Lanes

77.5%10

Average Daily

Trips ('000)

32

N/A

N/A

32

N/A

N/A


7 Queensland Motorways reached financial close for Go Between Bridge 24 December 2013. As a result this asset was only included for part of the YTD pcp.

8 Queensland Motorways reached financial close for Clem7 13 December 2013. As a result this asset was only included for part

of the YTD pcp.

9 Transurban's proportional ownership of 495 Express Lanes increased from 67.5% to 94.0% in June 2014.

10 Transurban's proportional ownership of 95 Express Lanes increased from 67.5% to 77.5% in June 2014.

Classification Transurban Group Transurban International Limited ABN 90 121 746 825

Transurban Holdings Limited

ABN 86 098 143 429

Transurban Holding Trust

ABN 30 169 362 255

ARSN 098 807 419

www.transurban.com.au

Level 23

Tower One, Collins Square

727 Collins Street

Docklands VIC 3008

Australia

Telephone +613 9612 6999

Facsimile +613 9649 7380

Level 9

1 Chifley Square

Sydney NSW 2000

Australia

Telephone +612 9254 4900

Facsimile +612 9254 4990

asx release

Appendix 3 - Calculation of proportional toll revenue by asset

Mar 15 quarter

100%

($'000)

% Transurban

Ownership

Proportional Toll

Revenue ($'000)

CityLink

$143,036

100%

$143,036

Hills M2

$54,530

100%

$54,530

Lane Cove Tunnel/MRE

$18,481

100%

$18,481

Cross City Tunnel

$13,593

100%

$13,593

M1 Eastern Distributor

$27,913

75.1%

$20,963

Westlink M7

$64,861

50.0%

$32,430

M5 South West Motorway

$51,250

50.0%

$25,625

Gateway Motorway

$46,036

62.5%

$28,773

Logan Motorway

$35,933

62.5%

$22,458

Go Between Bridge

$3,061

62.5%

$1,913

Clem7

$11,654

62.5%

$7,284

495 Express Lanes ($USD)11

$7,925

94.0%12

$7,449

95 Express Lanes ($USD) 11

$8,993

77.5%13

$6,970

FY15 YTD

100%

($'000)

% Transurban

Ownership

Proportional Toll

Revenue ($'000)

CityLink

$431,786

100%

$431,786

Hills M2

$164,783

100%

$164,783

Lane Cove Tunnel/MRE

$56,298

100%

$56,298

Cross City Tunnel

$41,097

100%

$41,097

M1 Eastern Distributor

$84,095

75.1%

$63,156

Westlink M7

$191,671

50.0%

$95,836

M5 South West Motorway

$149,016

50.0%

$74,508

Gateway Motorway

$141,056

62.5%

$88,160

Logan Motorway

$109,193

62.5%

$68,246

Go Between Bridge

$9,188

62.5%

$5,742

Clem7

$35,249

62.5%

$22,031

495 Express Lanes ($USD) 11

$25,190

94.0%12

$23,678

95 Express Lanes ($USD) 11

$9,264

77.5%13

$7,180

11 All USD figures have been converted to AUD at an average monthly rate for the purposes of calculating proportional toll revenue for the Group.

12 Transurban's proportional ownership of 495 Express Lanes increased from 67.5% to 94.0% in June 2014.

13 Transurban's proportional ownership of 95 Express Lanes increased from 67.5% to 77.5% in June 2014.

Classification Transurban Group Transurban International Limited ABN 90 121 746 825

Transurban Holdings Limited

ABN 86 098 143 429

Transurban Holding Trust

ABN 30 169 362 255

ARSN 098 807 419

www.transurban.com.au

Level 23

Tower One, Collins Square

727 Collins Street

Docklands VIC 3008

Australia

Telephone +613 9612 6999

Facsimile +613 9649 7380

Level 9

1 Chifley Square

Sydney NSW 2000

Australia

Telephone +612 9254 4900

Facsimile +612 9254 4990

distributed by