CuDeco Limited provided production update for the month of August 2017. For the month, the company production at its Rocklands Copper Mine in Cloncurry Queensland, was 1,104 tonnes of copper metal produced in 4,168 DMT of concentrate averaging 26.5% Cu (mill estimates). August production follows a solid month in July of 1,717 tonnes of copper metal produced. Metal recovery in August was 88.7% compared to 92% in June. Overall performance in August was lower than forecast with major planned and uplanned stoppages requiring lengthy shut-down periods. Collectively these were responsible for a 49% lower than forecast mill throughput for the period, which significantly reduced net metal output and recovery performance.