Integrated Green Energy Solutions Ltd. announced that the final Environment Agency ("EA") Permit for the Northampton site has been received. This permit gives the company full permission to construct and operate a 200TPD plastics to fuel facility at Northampton that will produce 70 million litres per annum of road ready diesel (EN590 compliant) and petrol (EN228 compliant). With the EA Permit in place IGE will finalise the purchase of the Northampton land. This was previously agreed with a term of the land purchase contract being that there must be an associated full and unencumbered EA Permit for the property. Northampton is in the in the East Midlands of England. It lies on the River Nene, about 60 miles north-west of London. It represents an ideal site to commence the Company's UK roll-out, and features: Power to 4.5MW available, in addition to existing water, roads, security; Waste sites nearby who have committed to supply sufficient feedstock; Arterial roads and motorway infrastructure within 5 km; and good size, flat ground and the ideal shape for an IGES facility. Planning for this facility is already well underway. Now that this final EA permit has been received, IGES will begin the remaining design and construction phase of the facility, which when completed will be capable of producing the 70 million litres of road ready fuel per annum.