MinRex Resources Limited announced the commencement of RC drilling at the Tambourah North Project along with the completion of drilling over the Talga- Moolyella North Lithium-Tin-Tantalum Project near Marble Bar. Drilling over the Tambourah North Project has now commenced, with a total of 10-12 RC proposed drillholes totaling approximately 1,540m. MinRex will target Zone 1 which mainly consist of spodumene rich pegmatites hosted within the Apex Basalt located in the northern portion of the tenement which yielded rock chip samples consisting of MRR028: 2.56% Li2O, 1.59% Li, 1,293 ppm Rb, 115 ppm Cs, 40 ppm Ta.

The company has also completed the first pass RC drill program over the Talga- North Moolyella Project. The total program consisted of 39 RC holes, totaling 2,825m. The drilling targeted the following: Western, Northern and Eastern Pegmatite Zones tested the stacked Pegmatites outcropping over highly elevated Li soil anomalies that have never been drill tested; intersection is extensive surface area comprising outcropping stacked pegmatites over the 3 zones with the series of stacked pegmatites over an area of up to 1.3km in length by 390m in width; Eastern Zone Pegmatite on drill hole MBRC047 intersected three Pegmatites at 0-14m, 20m-25m, 42m-46m in muscovite-albite-garnet-blue quartz pegmatite.

Tambourah North Lithium Project: Tambourah is located approximately 200 km south southeast of Port Hedland and 80km southwest of Marble Bar within the Pilbara Mineral Field. The Tambourah project area has become a lithium exploration hub with recent maiden RC drilling programs launched by Infinity Mining Limited, Rivers Gold Limited and Trek Metals Limited all confirming spodumene rock chip and RAMON tested high grade lithium assay results and petrophysical identification. The company will drill untested Zone 1, a series of stacked sheeted pegmatites hosting spodumene striking 450 over 300 metres with approximately 50m in width were located within the Apex Basalt Greenstone Belt.

The proposed drill program will comprise 10 RC drill holes, totaling 1,540m to test the outcropping high-grade lithium bearing pegmatites identified from the initial rock chip sampling program reported in April 2022. Talga - North Moolyella Lithium-Tin-Tantalum Project: The North Moolyella Project is situated 5km west of Global Lithium Ltd. Archer Lithium Deposit, which hosts 10.5Mt at 1.0% Li2O and 4km SSW of the historical Moolyella Tin Fields. The Talga-North Moolyella RC 39 drill hole pilot program was completed in early December 2022 with targeted drilling over highly elevated lithium soil anomalies extended east from the Global Lithium Limited Archer lithium deposit.

Drilling intersected coarse-grained individual pegmatites ranging from 2m to 24m width yielding multiple intersections of Pegmatite in drill holes with differing composition in muscovite, feldspars and garnet rich mineralogy.