Senvion, Libeccio S.r.l. and ERG Power Generation S.p.A. have signed extensions for existing service contracts for two projects in Italy. Senvion has provided the service for 48 turbines (total of 107.8 MW) since their installation. The projects are part of the 14.1 GW installed capacity serviced by Senvion globally. These contract extensions are a reflection of the positive perception that customers have of Senvion's service quality. With an average onshore availability rate of about 97% over the past year, Senvion's service technicians ensure a high visibility of returns for its customers. The Vento di Vino-Mazara of Libeccio project is located in Sicily. The seven Senvion 3.4M turbines have a unit power output of 3.4 MW and were the most powerful turbines installed in Italy for a long time. Senvion signed the full service contract (ISP) seven years ago and has provided the service and maintenance ever since the installation. The contract has now been extended and will be effective for the next eight years. The ERG project consists of the two wind farms Ginestra and Troia San Vincenzo, comprised of 20 Senvion MM92 and 21 Senvion MM82 turbines, respectively. It has a total installed capacity of more than 84 MW. Senvion and ERG have concluded an agreement to operate both wind parks under one single contract which foresees, among other conditions, the extension of the existing Utility Model Contract of Troia San Vincenzo for a further five years.