The system, which will go on sale in
In order to realize a carbon-neutral society by 2050, the buildings we work and live in will need to transform to become so called Zero-energy Buildings (ZEB) where the energy used in the building is created by renewable energy sources. Such buildings need to be highly energy efficient and require energy-saving air conditioning equipment, which accounts for approximately 20-40% of energy consumption in commercial buildings*1. In addition, there is an urgent need to address social issues such as soaring energy prices. In response to this social need, the three companies have jointly developed the 'Smart Mix Chiller,' the first product in
The system is a package product that combines YES's gas air-conditioning GHP chiller with its high peak-power reduction and winter heating performance and Daikin's highly efficient electric air-conditioning EHP chiller together with
Going forward, YES will continue its efforts to propose total energy solutions that contribute to energy conservation and CO2 reduction, aiming for a society that realizes energy-efficient lifestyles.
System and Service Features
1. 'Best of both worlds' hassle-free*3 operation of gas and electric air conditioning
The newly developed 'integrated controller' controls the number of units, flow rate, and fault monitoring for the entire system including GHP and EHP chillers. Combined with optimal remote control by
('Best of both worlds' operation of gas air-conditioning and electric air-conditioning)
The EHP chiller is prioritized in normal operation, while the GHP chiller is activated when air conditioning is under heavy load.
When demand for electricity is tight, the system automatically switches to priority operation of the GHP chiller to avoid exceeding the power contract while maintaining the comfort of the indoor environment.
When defrost operation*4 of the EHP chiller is anticipated in winter, the system automatically switches to a mode that facilitates operation of the GHP chiller to avoid defrost operation as much as possible. This maintains the comfort of the indoor environment in winter without the hassle of employing a supervisor.
2. Standardized controllers to reduce design and construction burden*3
The integrated controller eliminates the need to construct complex automatic control devices, reducing the burden of design and construction.
Yanmar GHP chiller (40 hp equivalent)
*1: From the
*2 Calculation conditions
Commercial facility: 30,000 m2, only 'store' air conditioning load is used out of the air sanitation society load (air conditioning scale: equivalent to 2,060 HP)
Assuming EHP chiller: GHP chiller = 50:50 installation case
Contract: (Electricity contract) Commercial holiday high-load electricity contract, (Gas contract) Dedicated contract for small air-conditioning
Maintenance and service charges: (EHP chiller) Estimated value based on
*3 A service contract 'ENESINFO' with
*4: During heating operation at low outdoor air temperatures, moisture in the air condenses on the heat exchanger of the chiller body and forms frost. Since the capacity and efficiency of the chiller decreases with frost adhering to the heat exchanger, defrost operation is performed to melt the frost, but during defrost operation, the chiller cannot perform its normal heating capacity, resulting in lower hot water temperatures. GHP chillers are characterized by the fact that they are less likely to enter defrost operation due to engine exhaust heat, and GHP chiller operation can maintain indoor comfort as much as possible even during low outdoor air temperatures.
About
With beginnings in
For more details, please visit the official website of
https://www.yanmar.com/global/about/
(C) 2022 Electronic News Publishing, source