West Wits Mining Limited Announces Rio Tinto Exploration Commences Maiden Drilling Program at West Wits' Mt Cecelia Project
the tenement (E45/5045), enabling the commencement of the Mt Cecelia Project's maiden drilling
campaign under the RTX Farm-In and Joint Venture Agreement. As previously reported, the targets are electromagnetic (EM) anomalies identified from airborne and ground EM surveys undertaken by West Wits in 2020 and 2021 respectively. The anomalies are interpreted as potential bedrock conductors that may represent base metal sulphide mineralisation. The initial three-hole drilling program has target depths of 300m per hole and is anticipated to be
completed by mid-November. The exploration team will prepare and send samples to ALS
laboratories for assaying.