Azoty signed a PLN 1.16 billion deal with a builder consortium led by Polimex-Mostostal for a 90-100 MWe coal-fired power block at the group's Pulawy plant. Polimex-Mostostal takes all but 1% of the headline sum within the consortium. The Azoty unit is paying 5% up front. Polimex-Mostostal will have 36 months to complete the project.