GE Power India Limited has received Letter of Intent from NTPC Limited, details of which are mentioned below:- Significant terms and conditions of order(s)/contract(s) awarded in brief: Supply of Spares for 660 MW Generator Overhauling at Nabinagar Super Thermal Power Station. Time period by which the order(s)/contract(s) is to be executed: 40 weeks. Broad consideration or size of the order(s)/contract(s): Base value as INR 104.7 million plus (GST 18%).